Showing posts with label Washington Channel Tunnel. Show all posts
Showing posts with label Washington Channel Tunnel. Show all posts

Tuesday, March 01, 2016

Renewed Silliness To Remove SE Freeway

disregarding the recent 11th Street Bridge replacement with its new ramp connections to the DC 295 Anacostia Freeway to and from the northeast.

via an article appearing February 29, 2016 in The Washingtonian "Let's Tear Down The South East Freeway And Build A New Neighborhood"

http://www.washingtonian.com/2016/02/29/southeast-freeway-development-construction-navy-yard-dc-neighborhood/

makes an interesting juxtaposition with the accompanying simplistic freeway removal ideology to discourage use of the New York Avenue corridor and the Center Leg and thus shift traffic to the SE Freeway-11th Street Bridge-DC 295 Anacostia Freeway combo.




The article is authored by Dan Reed, who studied for a Masters degree at the University of Pennsylvania, where he, with colleagues Susannah Henschel and Matt Wicklund, explored the possibilities and impacts of removing urban freeways,  particularly regarding Washington, D.C.'s  Southeast-Southwest Freeway, working with the National Capital Planning Commission.  He writes the following, which contains a number or serious flaws:
The Southwest Freeway, which carries a significant amount of traffic between the Potomac River and Fourth Street, Southwest, probably couldn’t be removed without overburdening the local street network. By the time it changes to the Center Leg Freeway and then to the Southeast Freeway, at South Capitol Street, the roadway carries a third fewer cars and could be replaced with a surface street that handles some of the traffic, with M Street, Southeast, and Pennsylvania Avenue picking up the excess. Biking and rapid transit could take care of the rest.
The amount of traffic upon the initial- western- segment of the Southeast Freeway is destined to carry significantly more traffic with the recent 11th Street Bridge replacement project that added new ramp connections on its southern end directly into the DC 295 Anacostia Freeway heading to and from the north-east, thus establishing a seem-less through D.C. connection.
The freeway changes dramatically along its path—sunken below street level here, rising onto an elevated there—so my colleagues and I developed three different treatments. At Fourth, Seventh, and Tenth streets, Southwest, the sunken Southwest Freeway is crossed by bridges. We thought about building a big cap over the freeway here, like Boston’s Big Dig, but decided it would be too expensive for the limited amount of new space it would create. Instead, we expanded each bridge to create a platform for small retail buildings, sort of like the Ponte Vecchio in Italy. They would help connect the north and south sides of the freeway visually for those crossing the bridges, while new retail could draw more street life to an area that has very little today.
The freeway is in a trench as it crosses 10th and 7th Streets SW, before rising to an elevated berm to the east thus crossing over 4th Street SW- thus the above statement is factually incorrect about the freeway being sunk below the 4th Street crossing.

How would a cap above the existing sunken segment be too expensive?  Other cities have had far more extensive cut and cover freeway projects, yet somehow this is "too expensive" for such a freeway within Washington, D.C., the Nation's Capital.  Rather, this would be a good time to remove the bottleneck with its dangerous two into one lane merge with the on ramp from Main Street, by replacing the existing retaining wall which is not designed to support a tunnel roof, with a new wall set out further to the south, allowing adding a couple lanes per direction, at the expense of a row of townhouses built in 1999 too close to the freeway- a mere 16 feet or so from the existing retaining wall.  This would be necessary to facilitate construction staging for the removal and replacement of the elevated segment to the east with a new lowered cut and cover tunnel segment.
Farther east, where I-395—now the submerged Center Leg Freeway—bends north toward New York Avenue, we’d build a platform, like the Capitol Crossing development, and place new retail, office, and apartment buildings atop it, reconnecting local streets that currently dead-end at the freeway. In the space where the 395/695 interchange now takes up nearly three square blocks, we’d create a grand new public square, similar to Farragut Square, granting this area much-needed open space.
This disregards that the freeway transitions from a trench at 7th Street SW to an elevated berm by the time it crosses 4th Street SW.   Any new platform to reconnect local streets, and such a "grand new pubic space" absolutely requires not simply covering an existing freeway segment but rather its removal and replacement with a new set of roadways constructed at a lower elevation.
East of there, we’d eradicate the Southeast Freeway entirely. Before the 1960s, Virginia Avenue—which still exists in fits and starts around Foggy Bottom and L’Enfant Plaza—was a broad boulevard not unlike Pennsylvania or Massachusetts Avenue. Our design puts it back. The new street would extend from just east of South Capitol Street to the 11th Street Bridge and all the way to the Anacostia, where it would end in a new waterfront park.
This disregards the above stated need to completely reconstruct the eastern portion of the SW Freeway at a lower elevation, as well as the recent 11th Street Bridge replacement project with its new ramp configurations making this a continuous through D.C. freeway route.   Without such a reconstruction, his platform atop the freeway would have to be likewise elevated, could not restore the street grid as the elevated highway would still be in the way, and would require a ramp to transition from the elevated freeway to the restored Virginia Avenue street level boulevard.

The idea of a restored boulevard could actually make sense if built atop a SW-SE freeway reconstructed underground.

Because of the need to maintain traffic throughout the construction project, the way to do this would be by a staged program:

- first constructing a parallel tunneled freeway facility, starting with a Washington Channel Tunnel akin to the 2008 U.S. National Capital Planning Commission proposal, continuing east beneath G Street SW-SE to Virginia Avenue, dipping under the new railroad tunnel, to a temporary merge into the SE Freeway, together with tunnel connections to the north along the Center Leg beneath 2nd and 3rd Streets.  This G Street Tunnel would be two levels, eastbound atop westbound.  Once completed, open the G Street Tunnel to SW-SE Freeway traffic heading to the 11th Street Bridges.

- secondly, remove the row of townhouses closest to the SW Freeway's southern side between 10th and 7th Streets SW, excavate that area, build a new retaining wall designed to support tunnel roof, framing additional freeway capacity, and continue this east, crossing beneath 4th Street SW, to the existing ramp to the Center Leg, and perhaps with an extension further east squeezed alongside the existing elevated SW-SE Freeway to minimize housing displacement, before merging to the east with the new G Street Tunnel to the existing SE Freeway.  Subsequently begin closing and removing the elevated SW-SE Freeway, and start constructing the underground replacement.  That could ultimately be shifted slightly southwards to improve the geometry of the connections with the Center Leg.  And it all would be opened together with the direction of the G Street Tunnel from the 11th Street Bridge. 

- subsequently, finish the new 2nd and 3rd Street Tunnels along the Center Leg.  Before these could be used as a through route, they would need a merge into northbound I-395, which would occur within a tunneled extension to the north-east, employing not the substandard geometry of the 1996 Ron Linton plan's curved transition at the rear of the Bibleway Church complex and then directly beneath New York Avenue, but rather a gentler radii curve arcing beneath the New Jersey Avenue/N Street intersection and the Dunbar field, to a straight line continuation under O Street NW/NE.   Optionally, build a temporary connection to New York Avenue near the location of the Fed Ex building.  Or expedite a permanent underground tunnel box freeway extension to the east along the northern side of New York Avenue featuring parallel box for a new WMATA rail transit line, and a decking over of the railroad chasm, with a new linear park and city scale real estate development atop; such would be easier than constructing that tunnel directly under New York Avenue as discussed during the late 1990s and early 2000s, and far more potentially profitable with the line of new real estate development.  

- This tunneled extension from the Center Leg to alongside New York Avenue should have design flexibility to ultimately accommodate tunnel box versions of freeway connections to the north along the Grand Arc reconstruction of the B&O Metropolitan Branch with a vast linear park atop, to an East Leg to RFK Stadium and the eastern end of the SE Freeway as a cover-way essentially extending the structure of Barney Circle, and for a tunnel directly under New York Avenue

Once the New York Avenue corridor box tunnel freeway is completed to Maryland Route 50, traffic could be shifted from the antiquated DC 295 Anacostia Freeway to facilitate the latter's reconstruction as a modernized cut and cover facility bring its specifications up to date while permitting opening up local access to the Anacostia River waterfront.

The failure of the Dan Reed article in addressing any of this, speaks volumes as to the deficit of thought with much of the trendy [anti] intellectualism of the ideology of outright freeway removal

Friday, January 06, 2012

Grand Arc 95-270


Time to rectify the social injustice of pushing the traffic burden disproportionately through SE, and that previously of the railway burden, to finally deliver Washington D.C.'s missing freeway linkage AND a new Northern Mall

JFK's Administration first proposed it as part of a "Y" route, along with the Committee of 100 on the Federal City - a tightly routed I-95 and I-70S along the B&O Metropolitan Branch RR -- Washington, D.C.'s sole above ground grade separated transportation corridor.

It was botched afterwards, politically sabotaged by the initial North Central Freeway engineering study which excluded it while considering instead an upwards of 37 routes all over the map, with a recommended route partially following the RR but with serious deviations in Brookland and especially Takoma Park. Though decently re-scribed in 1966, the B&O NCF was nonetheless demonified politically as a "white mans road through black mans homes" -- with infinitely greater protest hype upon the 34 houses in Brookland closet to the RR than the 600+ for the final North Leg East segment to link with the existing Center Leg (3rd Street Tunnel) -- never-mind it was relatively uncontroversial while the U.S. President who proposed it was still alive- JFK.

Politics of the past asides, the need and the logic of the still missing I-95 link inside the Beltway and into Washington D.C. is clear, along with the feasibility of the basic corridor proposed by the JFK Administration, augmented with routing its Northeastern Freeway into Maryland via the PEPCO power line right of way (replacing the Northwest Branch Park routing to Prince Georges Plaza Plaza shopping center).

Within the Beltway I-95 is clearly feasible with no residential takings in Maryland, and 13 retail strip properties, including a gasoline station, in an area alongside New Hampshire Avenue where I-95 would be depressed and could be covered with new development. Once within the District, it would displace about 27* houses north of New Hampshire Avenue and along a segment of Eastern and Rittenhouse (*considerably more if the tragically misplaced Comstock Homes "The Hampshires" project is built upon the now open space of the Masonic Eastern Star Home property) and then only 34 for the entire segment along the RR at the western edge of Brookland- 59 total- according to 1973 figures all the way down to interchange "B" within the railyards. This figure of 59 compares with that of 330 and 57 displaced in Virginia respectively for the Wilson Bridge and Springfield interchange widenings of the Beltway that became "I-95" with the cancellation of the real one for Washington D.C. With a re-design of the North Leg East link to the existing Center Leg/3rd Street Tunnel via a tunnel beneath O Street and arcing beneath the recreation field of Dunbar HS reduces the 600+ figure to as few as about 33.

But lets strive to go further to make this project truly knit the area together, with this highway project embracing a comprehensive redefining of this RR corridor,as the Grand Arc Project, building out the walls of Washington D.C.'s Union Station northward, covering over the railroads and the new highway built as encased tunnelways, all as the basis of a new Grand northern mall. The RR was built in one of two interior places with in Washington DC topographically suitable, the other being the Archibald Glover Park, which has no roads. Since the RR buried the creek, have the new buried highway UN-bury the creek, and reconnect the city by so decking over the rail junction trisecting the area Rhode Island and New York Avenues, in a fashion extending the legacy of monumental Washington, D.C.! Have it do this as well to the south by likewise addressing the existing built freeway segments, particularly the I-395 Center Leg and SW (and SE) Freeway and 14th Street Bridges, with parallel tunnelways beneath 2nd, 3rd and G Streets as part of a project building NCPC's 2008 proposal concept for a Washington Chanel Tunnel and replacement 14th Street Bridge[s].

Accommodate and reconcile greater human activity within a given footprint.

Madrid Spain's $5 billion M-30 project shows this is feasible.

Thursday, July 28, 2011

US NCPC to CHOCK its 2008 I-395 Tunnel Proposal?!

http://greatergreaterwashington.org/post/11444/southwest-ecodistrict-looks-to-fix-60s-planning-failure/

New planning proposals by the United States National Capital Planning Commission to build too closely to the I-395 Southwest Freeway, potentially hampering their 2008 Washington Channel Tunnel proposal

http://wwwtripwithinthebeltway.blogspot.com/2008/07/new-i-395-gateway-if-its-coordinated.html

It continues the ill advised idea seen in planning irresponsibly pushed by such organizations connected with the 'Committee of 100' on the Federal City, of a west extension of essentially the building line of the cir. 1999 'Capital Square' townhouses, a mere 16 1/5 feet away, clearly complicating constructing the I-395 Washington Channel Tunnel, leaving no room to maintain traffic, while blocking adding even a single lane

Thursday, February 10, 2011

SW Freeway Landing Area Targeted

'Southwest Ecodistrict'

Co-ordinated ? with the Washington Channel Tunnel?


from Rebuilding Place in the Urban Place

http://urbanplacesandspaces.blogspot.com/2011/02/public-meeting-southwest-ecodistrict.html

Wednesday, February 09, 2011
Public meeting: Southwest Ecodistrict,
Thursday February 17th

From email:

WANTED: IDEAS FOR FUTURE
L'ENFANT PROMENADE, MARYLAND AVENUE, AND SOUTHWEST PRECINCT

-Southwest Ecodistrict Public Meeting (focused on the area, depicted at left, surrounding the 10th Street and Maryland Avenue corridors in Southwest Washington, DC)
-
Thursday, February 17, 2011 6:00 PM – 8:00 PM

- USDA Headquarters,
Whitten Building Interior Courtyard 1400 Independence Ave. SW
-
SOUTHWEST ECODISTRICT VIDEO

The National Capital Planning Commission, in coordination with other federal agencies and the District of Columbia, invites you to attend a public meeting on the Southwest Ecodistrict Initiative -- focused on the 10th Street (L'Enfant Promenade) and Maryland Avenue corridors in Southwest Washington. This joint effort aims to advance the vision set forth in the Monumental Core Framework Plan by fostering an inviting, lively, mixed-use community, while accommodating the future needs of the federal and local governments. The initiative also supports President Obama’s Executive Order 13514 that calls on federal agencies to be leaders in environmental, energy, and economic performance.

Join the Conversation. Help shape this important area into a physical showcase of sustainable practices.

Come Prepared to Share Your Input. Project hand-outs will be available on NCPC’s Southwest Ecodistrict website on February 10, 2011.

RSVP preferred:
swecodistrict@ncpc.gov
Labels: land use planning, urban design/placemaking

posted by Richard Layman @ 2:47 PM&Permanent Link Comments

Saturday, August 21, 2010

Another Fenty Boondoggle?

Washington, D.C. Mayor Adrian Fenty's ceremony on project that has its northwestern end overlap with USNCPC's recent I-395 Washington Channel Tunnel

a revised version of my message to this project's developer's web site:
From the illustrations on your web site it appears that the northernmost portion
encroaches upon U.S. National Capital Planning Commission's proposed I-395 tunnel.

http://wwwtripwithinthebeltway.blogspot.com/2008/07/new-i-395-gateway-if-its-coordinated.html

What consideration has been given to ensuring that the development does not impact the tunnel?

Sincerely

Douglas Willinger
A Trip Within The Beltway
The numerous 'planning' faux pas with jamming the nearby Capital Square townhouses a mere 16 or so feet from the SWS Freeway retaining wall, and the Golden Rule senior citizens' apartment building in the path of the not yet employed northbound I-395 Center Leg Tunnel on ramp can only make one suspect the worst- that the building to the left will be driven into the ground with the utter contempt for NCPC's Washington Channel Tunnel, as much as Nationals Stadium did to the route of the previously proposed South Capitol Street corridor tunnel.

Apparently Washington D.C. is utterly lacking in any sort of prevailing political order worthy of displaying architectural tools as a logo.

See more:
http://wwwtripwithinthebeltway.blogspot.com/2008/07/new-i-395-gateway-if-its-coordinated.html

http://wwwtripwithinthebeltway.blogspot.com/search/label/Demolition%20Specials



Thursday, July 17, 2008

A New I-395 Gateway- If It's Coordinated With New Development

A big "if" ...

New 14th Street Bridges
with tunneled vehicular connections to 14th Street and I-395




New I-395 tunnel segment to come with replacement of the existing 14th Street Bridges. Employs virtually the same alignment that I have proposed, though with a somewhat sharper curved transition to the existing SW Freeway then necessary.

Idea of revised ramp connections to 9th Street appears to require demolition of existing building at L'Enfant Plaza, which is consistent with desire to remove the "brutalist" 1960s-70s era architecture, and which would likely be eased by removal of the row of 28 townhouses that were irresponsibly placed only 16 1/2 feet from the existing SW Freeway retaining wall in 1999-2000 as the northern edge of the "Capital Square" residential project by EYI Associates between 0th and 7th Streets. With this occurring within sight of the headquarters of the U.S. Department of Housing and Urban Development and the U.S. Department of Transportation, why did not these agencies object?

Beyond the sharper curved transition to the existing SW Freeway alignment, this NCPC plan differs from my conceptualization by lacking a split to a supplemental I-395 tunnel beneath G Street SW to ease constructibility (e.g. routing traffic- particularly during constructing the new connection to the existing SE Freeway alignment at 7th Street SW), while permanently providing additional capacity with a gentler curved connection to the north-south Center Leg (3rd Street Tunnel): easing a traffic bottleneck that customarily extends into Virginia.

The surface treatment differs with its lack of an extension of G Street SW towards the Jefferson Memorial providing some additional landfill to more integrate the area, and of a traffic circle at the 14th Street location of the I-395 tunnel portal. As I envision it, this new bridge/tunnel segment would be located on the extended axis of Louisiana Avenue.

This proposal also includes a new more literal "14th Street" Bridge -- together with the above mentioned new I-395 bridge -- crossing the Potomac River, with both having tunneled segment respectively to 14h Street and the SW Freeway. It also includes burying the railroad, preserving the existing railroad corridor but at a lower elevation accommodating a newly restored Maryland Avenue.


New development proposal by Hoffman-Struever Waterfront LLC

http://www.swdcwaterfront.com/

Yet will the authorities be able to control themselves to preserve the necessary easement for the new segment of tunneled I-395?

Or shall they place buildings directly in the path?

Boondoggles as "Capital Square", the "Golden Rule" apartment house, and a bit of the rush of development along the South Capitol Street corridor suggest the latter.

Final Approval for DC financing of Waterfront passed- SWDC Blog

A busy day for NCPC- Greater Greater Washington

National Capital Framework Plan- Continuing The Legacy