Thursday, July 08, 2010

The Fallacy of NOT Building the Diagonal South Leg Tunnel





Pics of the Reflecting Pool, July 2010; note the spots of smaller trees along each side at about the location of this 'diagonal' route I-695 tunnel.




Adopted from:
In 1966, a new design for Washington, D.C.'s South Leg segment of the Inner Loop Freeway appeared. It featured a single continuous, 5,600 foot long West Potomac Park tunnel, constructed by the cut and cover method, upon a diagonal routing fully east of Lincoln Memorial traffic circle and partially beneath the Reflecting Pool. Because of its continuous length, this was the one option featuring ceiling ducts for a ventilation system. Under this plan, the surface roads in West Potomac Park were to be removed.

This design, initially pursued as a full tunnel alternative to the previous design, was approved by the National Capital Planning Commission on September 15, 1966, and recommended to the D.C. Board of Commissioners for implementation. However, this diagonal route tunnel proposal came under criticism by the Fine Arts Commission at a meeting on September 20, 1967, for reason of its destruction of two spots of mature trees that flank the Reflecting Pool, which would require more than a generation for transplanted replacements to grow to the same size as the removed trees. Hence, the D.C. Department of Public Works would back away from this design at a closed door, Tuesday meeting of the National Capital Planning Commission, reported by a Jack Eisen article in The Washington Post on October 30, 1969. Accordingly, for reason of entirely avoiding the trees along the Reflecting Pool, the earlier plan, regained its earlier status as the largely officially preferred plan. Ironically, while this tunnel was not built, the trees it would have displaced and replaced along the north side of the Reflecting Pool were displaced and replaced for other reasons.

Friday, April 24, 2009

The Doctrinaire Anti New Highways Position of the 1970s- Continued

Canceling highways because private automobile an obsolete concept by the 1990s...



-->
... This request is made because, from my review of the “Combined Corridor and Design Report”, it is obvious that Mr. Airis is proceeding from demonstrably erroneous or obsolete premises, errors that would be manifest if there were an adequate hearing. For example, his report proceeds from the assumption that there will be a 50 percent increase in area population by 1990 with a 100 percent increase in auto travel. Such an assumption is incredible in the face of (1) recent actions by EPA under the Clean Air looking toward the necessity of reducing future auto travel and (2) the growing fuel crisis which, according to Administration spokesmen, will lead to gas rationing within six months and, by 1990, may well render the private automobile as obsolete as the horse and buggy. Furthermore, it should be noted that the proposed six-lane South Leg is designed on the premise that at least 50 percent of the traffic utilizing it would come from two highly controversial (and unapproved) freeways- the [I-66] North Leg Freeway and the [I-266] Three Sisters Bridge."


The Doctrinaire Anti New Highways Position of the 1970s- Peter S. Craig

The Doctrinaire Anti New Highways Position- 'Green' Party

Wednesday, April 30, 2008

New Lanes For the Wealthy

According to a Marc Fisher article in the Washington Post


Incredibly, with the Capitol visible at lower left, this illustration prophesies an elevated highway across the Mall- something with which I would disagree.

If that is supposed to be the obelisk of the Washington Monument, to the right of the Capitol below the letter "O" in "TOLLWAY", that perspective places this viaduct directly across and over the Reflecting Pool!

Such a route was officially planned during a part of the 1960s and 1970s, as the South Leg of the Inner Loop, though sensibly as a tunnel. This "diagonal" route, one of several options officially considered, had broad official planning group support during the late 1960s, with the primary objection that it would require replacing two spots of trees along the Reflecting Pool where it would pass directly beneath.


For that reason, a southerly tunnel route along Independence Avenue was instead selected during the early 1970s; yet the trees that the diagonal tunnel would replace along the northwest corner of the Reflecting Pool were nonetheless replaced anyway- perhaps due to a storm? By 1971 though, groups that had supported the concept of a tunneled link between I-66 and the SW Freeway had turned against the selected option of of a part tunnel, part open depressed, designed to be later covered option, and the project was canceled by 1976, with all of that corridor's traffic left upon the surface.

So the apparent message is new lanes, not for the general driving public as a tunnel, but rather only for the wealthy, and without regard to the surrounding environment.

Sunday, March 18, 2007

I-695 South Leg

Image produced by National Capital Planning Commission for the Washington Geographic Information System. Distributed by VARGIS LLC of Herndon, VA.

The South Leg of the Inner Loop would connect the I-66 West Leg with the SW Freeway. It first appears in the 1955 Inner Loop study, with the subsequent planning placing an emphasis upon constructing this highway link in a tunnel.

The initial 1955 designs (shown with SW Freeway):


Most of the route was to be a surface design, with short tunnel beneath the traffic circle just west of the Lincoln Memorial, emerging to follow Ohio Drive with 2 lanes per direction along the surface along the Potomac River, before meeting the South West Freeway at the 14th Street Bridge.

Alternate Plan with short tunnel beneath the traffic circle just west of the Lincoln Memorial, emerging to follow Independence Avenue with 3 lanes per direction.

The Subsequent Designs:


1963 Public Hearing Plan

This plan was presented at a public hearing on November 3, 1963, by the National Park Service and the D.C. Department of Highways and Traffic.

Like the 1955 design, this featured a 6 lane tunnel just west of the Lincoln Memorial, though longer at about 1,300 feet, and continuing to a point south-east of 23rd Street SW as this route began to turn to the east, to meet the alignment of Independence Avenue to a second tunnel segment dropping to about 37 feet below sea level directly beneath the Tidal Basin just north of the Kutz Memorial Bridge. A depressed roadway surfacing south of the floodgate structure at 15th Street was to connect this tunneled section with the South East Freeway, with a ramp connection to Independence Avenue at 14th Street.

This plan would have the support of governmentally affiliated bodies, the National Capital Planning Commission, the Commission on Fine Arts, plus private groups. As so quoted by The District of Columbia Department of Highways and Traffic" January 1970 report "Recommendation for the South Leg Freeway Alignment", the Committee of 100 on the Federal City commented,

"The South Leg proposal, sponsored by the Park Service, is expertly conceived ... we enthusiastically support it."

According to this January 1970 report:
The original 1963 plan was approved by the Bureau of Budget, and proceeded to the detailed design stages. Contract drawings for the Lincoln Memorial Tunnel were advertised for bids on June 24, 1965. The invitation for bids was canceled out of deference to the proposed Mall Master Plan which was being proposed at the time.

Alternative "A"

The 1963 plan was superseded by a modified version that, for the purpose of saving the trees along Independence Avenue, differed in its alignment for that portion of the route: instead, this version was to cross just south of Independence Avenue, to enter a short (about 250 foot long) grassed overpass tunnel, before crossing to the Avenue's north to enter the tunnel beneath the Tidal Basin. Like the 1963 plan, it was to be about 1/3 tunnel, and 2/3rds open-depressed, largely designed to be converted into a full tunnel at some future date.

Under this plan, part of 15th Street between Jefferson Drive and Independence Avenue was to be closed, along with Independence Avenue east of the Lincoln Memorial to 15th Street.

The engineering and construction costs for this design of this 6 lane, 1.5 mile project were (in 1972 U.S. dollars) $7,110,000 and $79,000,000 respectively, for a combined cost of $86,000,000. There were to be no right of way expenditures because the project was entirely within public lands. The January 1970 report calls this "Plan A". Accordingly:

The concept of the 1963 plan has been refined in Plan A in response to the desire to find a more suitable alignment compatible with comments of the Fine Arts Commission and to reduce costs. Though a cooperative effort between the Department of Highways and Traffic, the National Capital Planning Commission and the National Park Services staffs many details of the plan have been investigated.


Alternative "B" the diagonal tunnel

In 1966, a new design appeared, featuring a single continuous, 5,600 foot long West Potomac Park tunnel, constructed by the cut and cover method, upon a diagonal routing fully east of Lincoln Memorial traffic circle and partially beneath the Reflecting Pool. Because of its continuous length, this was the one option featuring ceiling ducts for a ventilation system. Under this plan, the surface roads in West Potomac Park were to be removed.

This design, initially pursued as a full tunnel alternative to the previous design, was approved by the National Capital Planning Commission on September 15, 1966, and recommended to the D.C. Board of Commissioners for implementation. However, this diagonal route tunnel proposal came under criticism by the Fine Arts Commission at a meeting on September 20, 1967, for reason of its destruction of two spots of mature trees that flank the Reflecting Pool, which would require more than a generation for transplanted replacements to grow to the same size as the removed trees. Hence, the D.C. Department of Public Works would back away from this design at a closed door, Tuesday meeting of the National Capital Planning Commission, reported by a Jack Eisen article in The Washington Post on October 30, 1969. Accordingly, for reason of entirely avoiding the trees along the Reflecting Pool, the earlier plan, regained its earlier status as the largely officially preferred plan. Ironically, while this tunnel was not built, the trees it would have displaced and replaced along the north side of the Reflecting Pool were displaced and replaced for other reasons.

The engineering and construction costs for this design of this 6 lane, 1.5 mile project were (in 1972 U.S. dollars) $10,710,000 and $119,000,000 respectively, for a combined cost of $129,710,000. There were to be no right of way expenditures because the project was entirely within public lands. During the early 1970s, this design was known as "Plan B". This design appears to be an evolution of a relatively little remembered 1965 effort that included options"B" under the main portion of the Tidal Basin, and "C" for a tunnel under Ohio Drive.

1965

Alternative "C"

A shorter, less ambitious proposal (though nonetheless easy to build upon as the basis of a future tunnel extension) meanwhile, would have constructed a tunnel section to the west of the Lincoln Memorial (essentially the same tunnel design composing much of the western portion of the 1963 and 1963 modified design proposals, through extending slightly further east), so modified to feed directly upon to Independence Avenue, so rebuilt to descend below grade to the west of 19th Street SW. As essentially the western portion of "Plan A", "Plan C" could ultimately be extended (with a minimum amount of demolition and repetitive construction) to becoming "Plan A" (or some variant), via a future tunnel extension easterly beneath Independence Avenue to connections to that Avenue and the South West Freeway.

On February 17, 1970, the D.C. City Council would endorse this plan, with any future extensions by tunnel only.


The engineering and construction costs for this design of this 6 lane tunnel and its approaches (in 1972 U.S. Dollars) was $2,340,000 and $26,000,000, for a combined cost of $28,340,000. As with the other design proposals there were to be no right of way expenditures, since the project was entirely within public lands. During the early 1970s, this design was known as "Plan C
".

Design Standards:

Each of these 3 latter design proposals for the I- 695 South Leg Freeway were designed to prevailing Federal Highway Administration interstate highway standards:
  • Design Speed - freeway: 50 m.p.h.
  • Design Speed - ramps: 30 m.p.h.
  • Maximum Gradient: 6%
  • Lanes per direction: 3
  • Lane widths: 12 feet
  • Minimum vertical clearance: 14.5 feet
  • Shoulders- outside: 10 feet
  • Shoulders- inside: 5.5 feet
  • Shoulders- inside (in tunnels and depressed sections): 4.5 feet
  • Lowest elevation: approximately 37 feet below sea level (Tidal Basin Tunnel of 1963 and 1963 modified designs); approximately 41 feet below sea level (for West Potomac Park Tunnel of later 1960s diagonal plan).
Official Design Choice:

Suggestions from those favoring a South Leg would lead to the choice of "Plan A", so designed with the necessary walls and space for lateral ventilation ducts, in order to allow the future conversions of much of its uncovered depressed sections into a full cut and cover tunnel. In a letter by Tom Aires, Director of the D.C. Department of Highways and Traffic to D.C. Mayor Washington, dated May 8, 1973:

As a result of the evaluation of public hearing testimony, agency review comments, environmental and transportation data, and government policies, the Department of Highways and Traffic recommends the location of the South Leg as depicted in Alternative A and a design modification of Alternative A. In the interest of minimizing harm to the public lands involved, a third 1,300 foot long tunnel [segment] was added to the Alternative A design to provide 3,900 feet of underground roadway. The design permits the ultimate conversion from three separate tunnels to one continuous tunnel of approximately 5,000 feet in length when all vehicles are conforming to the 1975-1976 emission control standards.
Justification:

According to
the January 1970 report:
In summation, the above outlined transportation planning reflects a total agreement among planning agencies that the South Leg link between the Potomac River Freeway and the Southwest Freeway is a vitally necessary traffic carrying component of the transportation system for the District of Columbia. At present, traffic is carried on the surface via Independence Avenue though this corridor. The surface roadway is deficient in two basic respects.

Firstly, through traffic capacity is insufficient because of unavoidable traffic turning movements at intersections.

Secondly, the vehicular use of the surface roadway conflicts with the use of this important area by park visitors.

The objective is to free this important park area of traffic roadways and provide a facility capable of handling a volume of 90 - 100 thousand vehicles per day.

Opposition:


The I-695 South Leg was not much of an object of opposition until the early 1970s, as it did not displace anyone, and was designed to ultimately bury much of an existing road-link, by replacing surface Independence Avenue SW. Though there were objections to an open depressed roadway segments, these were to be covered as tunnel in the future, hence the environmentalist arguments are open to interpretation, as well as an intellectual scrutinization.

Many of those testifying at the September 6-7, 1972 Public Hearings though would go on record opposing any South Leg project, such as Peter S. Craig, a lawyer, for the Committee of 100 on the Federal City, who wrote the following in a letter to D.C. Mayor Washington dated November 13, 1973, in opposition to building any South Leg:

"...from my review of the "Combined Corridor and Design Report", it is obvious that Mr. Aires is preceeding from demonstrably erroneous or obsolete premises, errors that would be manifest if there were an adequate hearing. For example, his report proceeds from the assumption that there will be a 50 percent increase in area population by 1990 with a 100 percent increase in auto travel. Such an assumption is incredible in he face of (1) recent actions by EPA under the Clean Air Act looking toward the necessity of reducing future auto travel and (2) the growing fuel crisis which, according to Administration spokesmen, will lead to gas rationing within six months and, by 1990, may well render the private automobile as obsolete as the horse and buggy." [!!!]

Some opponents would resort to out-right misrepresentations as this photo-mock up illustrating a tunnel portal with a transition to a surface roadway displacing the Reflecting Pool due east of the Lincoln Memorial!



Pretext for Cancellation:

With construction scheduled to be underway by 1976, concern about the disturbance of construction during the nation's bicentennial celebrations became a justification by D.C. Mayor Washington to put the project's start on indefinite hold.
Afterwards, the project was "de-mapped" to siphon its funds to speed WMATA construction by a few months, particularly for projects outside of Washington, D.C.

This writer does not know why the authorities prioritized the South Leg which would connect I-66 to the under-capacity SW Freeway, rather then the North Leg K Street Tunnel which would extend I-66 independently of the SW/SE Freeway.

Friday, December 01, 2006

1955-62 Plans

1959 Mass Transportation Plan

1955 Inner Loop Freeway Proposal


1955 Inner Loop Freeway Proposal Guide to Plates



Plate 1


Plate 2


Plate 3


Plate 4

Plate 6


Plate 5



Plate 7

Plate 7A



Plates 9a and 8
W

1955 Inner Loop Whitehurst - West Leg Interchange


1955 Inner Loop North Leg - East Leg Interchange

North Leg West


North Leg East


SW Freeway








1957 design West Leg interchange


1957 Route 240 Northwest Freeway
along Georgetown waterfront


1957 Route 240 Northwest Freeway
at Chain Bridge





I-66 North Leg West with dotted lines indicating I-70S at 14th Street and the North Central Freeway at Sherman Avenue (note the tight spacing between these interchanges!)





1959

part tunneled east-west Cleveland Park I-70S segment-
west of Rock Creek Park


open depressed Mt. Pleasant I-70S segment-
east of Rock Creek Park




1960

This 1960 I-95 route could feed directly into the I-295 East Leg along 11th Street NE/SE.



1961

A 1961 rendering of the SW/SE Freeway, with unadopted route for SE Freeway along southern side of railroad.

A 1961 rendering of a proposed parking garage atop the Center Leg at F Street NW