Jimmy Carter 1976- World To Run Out of Petro in 35 Years





This was the general type of mindset that was used to 'de-map' the Washington, D.C. Freeway system during the 1970s, as displayed in this November 13, 1973 letter by Peter S. Craig on behalf of the "Committee of 100 on The Federal City" to D.C. Mayor Walter E. Washington, regarding the proposed I-695 South Leg Freeway to connect I-66 with the SW Freeway:
http://wwwtripwithinthebeltway.blogspot.com/2009/04/doctrinaire-anti-new-highways-position.html
. ... This request is made because, from my review of the “Combined Corridor and Design Report”, it is obvious that Mr. Airis is proceeding from demonstrably erroneous or obsolete premises, errors that would be manifest if there were an adequate hearing. For example, his report proceeds from the assumption that there will be a 50 percent increase in area population by 1990 with a 100 percent increase in auto travel. Such an assumption is incredible in the face of (1) recent actions by EPA under the Clean Air looking toward the necessity of reducing future auto travel and (2) the growing fuel crisis which, according to Administration spokesmen, will lead to gas rationing within six months and, by 1990, may well render the private automobile as obsolete as the horse and buggy. Furthermore, it should be noted that the proposed six-lane South Leg is designed on the premise that at least 50 percent of the traffic utilizing it would come from two highly controversial (and unapproved) freeways- the [I-66] North Leg Freeway and the [I-266] Three Sisters Bridge."
 (2) the growing fuel crisis which, according to Administration spokesmen, will lead to gas rationing within six months and, by 1990, may well render the private automobile as obsolete as the horse and buggy.

Never-mind the feasibility of alternative fuels, synthetic fuels, alcohol based fuels based upon various forms of bio-mass.   Somehow we were simply going to abandon automobiles in mass rather than admit to the reality that the market would simply shift to alternative liquid fuels.  Or that we could not even consider an Open Fuel Standard, as per the sort of technology seen with the 1963 Chrysler Turbine.  Let alone bring about the mass development and deployment of quite excellent electric and hybrid electric automobiles.

And never-mind even the utter inaccuracy of such predictions, as we are now 25+ years past 1990, and petroleum supplies have become sufficient as to bring about a major drop in petroleum prices, which after spiking to over $100 an barrel are now down to around $30.

Nor the potentially misleading Peter S. Craig characterization about the proposed South Leg's accompanying "highly controversial" freeways, the North Leg and the Three Sisters Bridge.   Though the latter was quite well protested, the North Leg had become far far less controversial before 1973, as per the plans approved by the D.C. City Council, U.S. National Capital Planning Commission (NCPC) and the D.C. Department of Public Works by the late 1960s, replacing the initial highly unpopular version of the North Leg seen in the 1955 Inner Loop report for an extensive new swath along Florida Avenue and U Street, with the alternative promoted by that initial plan's opponents as Elizabeth Rowe of NCPC and the Committee of 100 on the Federal City, of a cross town I-66  Tunnel under K Street NW.


1971 Inner Loop

Nor the characterizations (see underlined) contained within a May 12, 1975 letter by Elizabeth Rowe upon behalf of the Committee of 100 On the Federal City:
Dear Mr. Chairman and Members of the Council:
The Committee of 100 on the Federal City respectively requests early action by the Council on two very pressing transportation matters:  
First the de mapping of unnecessary and unwanted freeways in the District of Columbia through amendment of the city's Comprehensive Plan and appropriate requests to the US Department of Transportation for the removal of such freeways from the Interstate system
Second, the initiation by the Council, in cooperation with the Mayor, of a request to the U.S. Department of Transportation for the transfer of the federal aid formerly earmarked for such freeways (in excess of $1.4 billion) for completion of the presently-authorized Metro rail transit system.
These actions are necessary to implement two very pressing needs: First to remove forever the cloud of destruction and more autos in an auto-chocked city caused by the presence of obsolete freeway plans in the comprehensive plan and on the interstate system; and second, to help meet the escalating costs of construction of the Metro system.
Respectfully submitted,
Mrs. Elizabeth Rowe, Chairman
That letter was accompanied by a letter dated the same day from Peter S. Craig calling for the deletion of every freeway segment that ended up being 'de-mapped', including that of the I-66 K Street Tunnel, upon the grounds that "...This Council already has urged that Virginia abandon I-66 inside the Beltway in Virginia. Consistent with this action, I-66, within the city should also be scrapped."  never-mind that I-66 inside the Beltway was built and opened to traffic by 1982.  See both of these May 12, 1975 letters here.

Notably, the U.S. Federal Highway Administration documents about these 1975-1978 "de-mappings" strangely, show a map of the proposed freeway system, not as approved by U.S. NCPC and the D.C. City Council, such as the 1966 "Low Level" B&O Route North Central Freeway that was close to what the JFK Administration prescribed in 1962, but rather an earlier set of plans featuring the latter (1963+) version of the East Leg to RFK Stadium/East Capitol Street, and the 1967 straight line diagonal tunnel route version of the South Leg, but with the earlier plans for the North Leg, together with the infamous 1964 bastardization of the B&O North Central Freeway, as if the controversy was being stoked within the Federal level.


Rather than address such a strange set of discrepancies though, by asking if and why the U.S. Federal Highway Authority had actually kept these earlier highly unpopular routes as its official plans into the 1970s, the Peter S. Craig letters instead focusing upon simply "de-mapping" the entire yet to be built system, asides from the short extension of the Center Leg north from Massachusetts Avenue to K Street, as a source of obtaining some extra funding for the WMATA system.  Never-mind that the 1962 JFK Administration planning had included both what essentially became the WMATA system and the freeways.

Apparently, at no time, did any of this discussion of any of these "de-mappings" ever ask if they were truly necessary, nor contrast this extra funding for WMATA with the extra costs for reviving any of these freeways at some time in the future, as the purported permanent nature of of such "de-mappings" - as opposed to say simply deferring them -- would translate to a failure to preserve rights of ways/easements from subsequent real estate development situated without regards to their impacts upon such costs.   Consequently, we have seen such real estate development travesties as the blockage of the path of the Center Leg Tunnel northbound on-ramp just to the north of K Street by the irresponsibly located "Golden Rule" apartment building; the current "Capitol Crossing" air rights project that steals half of Center Leg's 8 lane design capacity, various projects irresponsibly built too close to the B&O corridor constricting its expansion, plus that of "The Hampshires" townhouse project upon what was traditionally the open field of the Masonic Eastern Star Home property along the north side of New Hampshire Avenue directly in the path to connect the B&O and PEPCO corridors- with both these latter two projects initially promoted as products of the Jarvis Company.

It would be one thing if planning as that simply involved the highly locally destructive earlier planned routes.

For instance, I don't consider the Takoma Towers apartment building in Takoma Park, Maryland, built in 1972 and located exactly upon the infamous 1964 route deviation, to be a "demolition special" as that's an insane routing location for the North Central Freeway.  Nor would I apply such a term to say something built upon the path of the original North Leg along Florida Avenue and U Street.

Rather, I use that term to describe such projects as:

- Those that intrude upon the Center Leg, as "Golden Rule".  The intruding portions of the substructure of "Capitol Crossing".

- Projects in Brookland, D.C. as those directly upon the B&O Route as planned in 1962 and 1966+.  Such as that upon the I-95 portion, as those to the east as a portion of the recent development just south of Rhode Island Avenue, and to the north with the the Douglass Development project to the east at 805-809 Channing Place NE, "Brookland Station" project along 9th Street, whatever is proposed upon the WMATA facility, and the industrial strip further north.  Plus the nearest portion of what was recently built at Fort Totten.  And those to the west upon what is the better idea for routing the southbound lanes -- consider the vista just south of Franklin Street! -- as the "Arts Space" duet, anything along the eastern side of 8th Street, and further south, the MRP proposal to the west, plus something upon the Brookland WMATA facility.

- Those further north along the B&O, whether from the 1960s as the Montgomery Gardens apartments immediately west of the B&O just north of its entry into Washington, D.C., thus pushing both directions of the I-70S (I-270?) North Central Freeway to the east to bring it into conflict with the row of older houses along Takoma Avenue, and currently, with what WMATA is having EYA build upon their facility in Takoma.   And especially that area's projects as "Cedar Crossing" and "Elevation 314" which constrict the B&O corridor in an exceptionally irresponsible manner as potential death traps located within the footprint of a potential de-railment sending heavy freight train cars tumbling downward from a railway that is elevated into these dangerously close wood framed residential buildings.  Past de-railments, one from this elevated railway in 1976, and another from a non elevated segment more than a mile northward in Silver Spring Maryland in 1996 would avoid such potential death, as the former tumbled into Blair Road and the latter into a parking lot, with the respective houses and apartment building being set further away from the railroad.  

- And of course "The Hampshires" townhouse project directly in the path to connect the B&O and PEPCO corridors- the latter being infinitely preferable than the earlier routing via Northwest Branch Park, and the logical option under Federal legislation barring the use of park-lands for highways when there is a reasonable alternative, as in this case, of a 250 foot wide electrical power line right of way- with the combined B&O-PEPCO Route and its connection along the northern side of New Hampshire Avenue constituting the Least Environmentally Damaging Practicable Alternative (LEDPA) for a northern radial highway for Washington, D.C.  Despite this, U.S. National Capital Planning Commission (NCPC) Executive Director Patricia E. Gallagher, AICP, in a decision regarding a proposed re-zoning:
http://wwwtripwithinthebeltway.blogspot.com/2011/02/us-ncpc-perjury-2006.html
On behalf of the West Group Development Company, LLC and The Jarvis Company, LLC, the District of Columbia Zoning Commission has referred a proposed action for a consolidated Planned Unit Development (PUD) and a map amendment for a residential development for review and comment. The proposed PUD (6000 New Hampshire Avenue, NE is located within the Lamond-Riggs neighborhood in northeast Washington, D.C. on approximately 11.5 acres in Parcel 126/74 and Lot 858 in Square 3719, bounded by Rittenhouse Street, New Hampshire Avenue, Peabody Street, Chillum Place and Sligo Mill Road, NE, and in Lots 69–73, 801, 824 and 826 in Square 3714, bounded by Peabody Street, New Hampshire Avenue and 1st Street, NE. ... [upon] ... the former campus of the Masonic Star Nursing Home and Med-Star Health offices and is currently an open lawn area that is under-developed....
Pursuant to delegations of authority adopted by the Commission on August 6, 1999, I find that the proposed consolidated Planned Unit Development (PUD) and related map amendment for a residential development (6000 New Hampshire Avenue, NE) located in Parcel 126/74 and Lot 858 in Square 3719 bounded by Rittenhouse Street, New Hampshire Avenue, Peabody Street, Chillum Place and Sligo Mill Road, NE and in Lots 69 – 73, 801, 824 and 826 in Square 3714 bounded by Peabody Street, New Hampshire Avenue and 1st Street, NE, Washington, D.C., would not adversely affect any federal interests nor be inconsistent with the Comprehensive Plan for the National Capital.
Such projects most certainly adversely affect the federal interest of an efficient, modern highway system for the Nation's Capital, in particular to provide a mixed use radial freeway within the vast northern Washington, D.C. arc served by no freeways whats-over between the George Washington Parkway in Virginia and the Baltimore-Washington Parkway from Maryland, no interstate freeways from I-66 to the west in Virginia to I-295 from the south in Maryland, and mixed use freeways from I-395 (former I-95) in Virginia to Route 50 from Maryland, as inside the Beltway Virginia I-66 is not open to trucks.

This U.S. NCPC "planning", like that of the 1975+ de-mappings, make no such apparent mention of any of this, nor that the Baltimore-Washington Parkway and the Route 50 Freeway feed into a sole freeway into Washington, D.C.- the antiquated DC 295 Anacostia Freeway, which is both substandard for traffic serviceability and for local connectivity being a conventional surface and elevated facility severing D.C.'s neighborhoods to the east - incidentally its least affluent area - from the Anacostia River waterfront.

All of these projects intrude upon space needed remedying this deplorable status quo, conflicting with vital links to the north necessary as alternative routes as the vital B&O-PEPCO North Central/Northeastern Freeway constructed in a neighborhood friendly fashion as cut and cover tunnelways beneath new linear parks atop to spread the traffic burden, as well as permit closing the existing antiquated-divisive Anacostia Freeway to facilitate its replacement with a modern cut and cover facility to re-unite D.C.'s least affluent neighborhoods with the Anacostia River waterfront. 
 
The outright "de-Mapping" rather than deferring the freeways, for fiscal and environmental-social justice reasons, should have been defined as criminal.

Tuesday, January 13, 2015

Feds Stoked Controversy Over D.C. Freeways By Keeping EARLIER Routes as Official?


U.S. Federal Highway Authority (FHWA) has a web page about the 'de-mapings' of the various freeway systems, including that near and within Washington, D.C.
http://www.fhwa.dot.gov/highwayhistory/data/page05.cfm

Weirdly, that page , shows the earlier routings for the northern portion of the Inner Loop and the 1964 routing for the North Central Freeway (with the 1967 routings for the South Leg and the East Leg).


It completely disregards the extensive evolution of the highly controversial I-66 North Leg routing via the open trench and raised berm along Florida Avenue and U Street being replaced by the I-66 North Leg K Street Tunnel.

The I-66 K Street Tunnel alternative had the later 1960s support of both the D.C. City Council and U.S. NCPC, with the District Department of Public Works being the sole hold out favoring the U Street plan until late 1969 or early 1970.

The highly unpopular Open Trench and Raised Embankment Along Florida Avenue and U Street

 The plan initiated by opponents to the Florida Avenue-U Street Plan:
the I-66 K Street tunnel
 
http://www.roadstothefuture.com/DC_Interstate_Fwy.html

The I-66 portion of the North Leg of the Inner Loop would have extended from the present I-66 terminus near the Watergate Apartments at K Street NW, extending as the North Leg under K Street NW in a tunnel, and emerging east of Mount Vernon Square and junctioning with I-95 about a mile north of the U.S. Capitol Building. The I-66 portion of the North Leg would have had 6 lanes. The I-66 K Street Tunnel was the solution to the original I-66 alignment that would have run east-west through urban neighborhoods alongside Florida Avenue NW, and between T and U Streets NW about a half mile north of K Street NW. If the K Street Tunnel had been built, it would have been a cut and cover design, about 1.5 miles long, buried out of sight under the straight 147-foot wide avenue, and passing under Mount Vernon Square, and it would have run from near Watergate almost to today's New York Ave./I-395 junction. I-66 crosses the Potomac River from Arlington, Va. to D.C. on the Theodore Roosevelt Bridge, which opened on June 23, 1964.

Likewise the FHWA page on the 'de-mapings' shows the extremely unpopular 1964'Recommended route" #11 'Railroad-Sligo East' version of the B&O Route- which was widely, strongly and legitimately opposed.


  This map of the freeways 'de-maped' during the 1970s
shows the 1964 version of the North Central Freeway
that deviates from the B&O railroad


 1964 version of North Central Freeway 
deviates from B&O railroad just north of New Hampshire Avenue



 1966 version of the North Central Freeways
stays with the B&O railroad- here shown at New Hampshire Avenue


The opposition to the 1964 North Central Freeway plan was so strong that the authorities had to return 2 years later with the 'supplementary' North Central Freeway study report of November 1966 for a low level B&O route more or less conforming to the 1962 JFK vision.  That report included an illustration of a possible decking over of the freeway alongside the main body of Catholic University of America as well as a bit to the south- though fails to include any isometric drawings in detail as done in 1963 and 1965 with the Fenway segment of the proposed Boston Inner Loop.

Proposed park atop Boston Inner Belt- 1965

Proposed lid atop North Central Freeway CUA area- 1966

As can be gathered from a 1967 letter to Maryland Governor Spiro Agnew by Takoma Park resident Duncan Wall, replacing the 1964 plan with the 1966 plan had caused the opposition to largely die down, only to be renewed again with the waffling of authorities, particularly within the then brand new US FHWA to re-consider using the 1964 plan as 'cheaper':

http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
Citizens of Takoma Park and Silver Spring had reason for their demonstrations of bitter dissatisfaction with the highway authorities of your predecessor's administration. After we had been given reason to believe that the causes of our protests had been in at least some part overcome, the matter now threatens to break into renewed bitterness. I am sure you will wish to avoid this as much as many of us....

The re-studied proposal also tacitly admitted that the route first proposed was needlessly, even carelessly if not ruthlessly, destructive of our communities. The new version hugged both sides of the existing Baltimore and Ohio railway, thus avoiding a new swath of destruction to divide our communities and sharply reducing the number of homes to be taken.

The reduced, re-routed proposal was made public last year with endorsement of D.C. And Maryland highway authorities. The D.C. Portion was forced through the National Capital Planning Commission by votes of representatives of the D.C. Highway Department and of the U.S. Bureau of Public Roads. From this we concluded, reasonably enough, that the highway authorities of the two jurisdictions (Maryland and D.C.) had reached a firm understanding with the Bureau of Public Roads.

Many of us were therefore astonished and aroused to preparations for renewed protests when Washington newspapers recently reported that the Bureau has acted to open it all up again. We have not found the Bureau forthcoming with candid information, but the press articles intimate an intention to force Maryland to accept modifications of route or design ostensibly "cheaper."

The result is that the whole controversy, which had been somewhat quiescent, is beginning to agitate the communities again. I can assure you this is so, for although I recently resigned chairmanship of the Metropolitan Citizens Council for Rapid Transit and write this simply as an individual citizen who wishes your administration well, I do remain in close touch with neighborhood sentiment on transportation-related issues.
As reported by The Washington Post, May 8, 1967:
Top officials of the Bureau have ordered a full review of the plans for the 3 ½ mile road … While it is good practice to disrupt as few people as possible in road building, is it worth the added cost of $22 million?

… Rejection by the Bureau would certainly fan the embers of one of the Washington area’s freeway controversies spearheaded by a group called the Save Takoma Park Committee. It rallied the residents of the middle income suburb composed largely of turn of the century homes on tree lined streets to strident opposition at hearings in Washington and Silver Spring on the original [1964] alignment.
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
A cost savings of $22 million would translate percentage wise to 12.3%, given the approximately $271 million cost given in the 1966 'Supplementary' North Central Freeway Engineering Report for the B&O Low Level Option.

Such was why the D.C. City Council and U.S. NCPC would reverse their long standing support for the JFK B&O freeway concept by the end of 1968:


February 6, 1967: presentation of the new B&O Low Level North Central Freeway plan to NCPC
May 1967: NCPC approves 1st link of North Central Freeway
October 1967: NCPC approves final link of North Central Freeway 8-2
February 1968: law suit decision by U.S. Court of Appeals
February 17, 1970: D.C. City Council votes against North Central Freeway
September 17, 1970: legislation in Congress in the House Public Works Committee ordering North Central Freeway construction.
April 9, 1972: Maryland drops I-70S
February 1973: Maryland drops I-95 by the Northwest Branch Park corridor.
July 16, 1973: Maryland drops I-95 via the PEPCO right of way.
 
Also see:

The following maps show the DC freeway system as the design had evolved by the 1970s:










The federal action of retaining the earlier unpopular routings is consistent with the crafted controversy of the scuttling of the B&O route via the 1964 betrayal of the recently assassinated JFK's planning, the FHWA cir 1967-1968 waffling, along with such things as the highly questionable "support" of such organizations as the Federal City Council.


Should not the FHWA de-maping page instead show maps as these found on Scott M. Kozel's informative site Roads to the Future - and that below of what Maryland canceled in July 1973?

PEPCO-B&O I-95

I was once told by an elderly lady involved with the anti-freeway protests of the 1960s and 1970s that despite the design and routing evolution of that time that had lead to the development of plans that were far far less controversial, that the Feds in fact had formally retained the infinity more controversial earlier plans, thus crafting the levels of anti urban freeway sentiment sufficient to bring about the 'de-mapings.'

I had found that too incredible to believe particularly with the design evolutions that had occurred.  However, the FHWA 'de-maping' page shows maps backing that up.

View the page for yourself:

http://www.fhwa.dot.gov/highwayhistory/data/page05.cfm

Withdrawal of I-70S, 95, 66, 266, 295, 395 &695 -- Washington, DC

Description of Withdrawn Routes
The withdrawal of seven Interstate Routes or portions thereof (I-70S, I-95, I-66, I-266, I-295, I-395 & I-695) in Washington, DC was accomplished in six stages.
Withdrawal Action
Stage One

On June 27, 1975, Mayor Walter E. Washington requested the withdrawal of two segments from the Interstate System: (a) I-95 between I-295 and the Maryland State line and (b) all of I-70S in the district.

On October 3, 1975, Federal Highway Administrator Norbert T. Tiemann and Urban Mass Transportation Administrator Robert E. Patricelli approved the withdrawal of the two routes under the provisions of 23 U.S.C. 103(e)(4). The withdrawal removed 5.4 miles in DC from the Interstate System.

In accordance with Section 103(e)(4), DC's unobligated balance of Interstate Construction (IC) funds was increased by approximately $159.2 million to $304.3 million since the withdrawal was approved prior to the May 5, 1976, enactment of the Federal-Aid Highway Act of 1976. The increase was accomplished by increasing DC's IC apportionment for FY 1977.

Stage Two

On December 29, 1976, Mayor Walter E. Washington requested the withdrawal of two more segments from the Interstate System: (a) the portion of I-66 between I-266 and I-395, and (b) the I-266 Three Sisters Bridge over the Potomac River to the Virginia State line. The two route portions total 2.50 miles.

On April 29, 1977, Federal Highway Administrator William M. Cox and Urban Mass Transportation Acting Administrator Charles F. Bingman approved the withdrawal of the two routes under the provisions of 23 U.S.C. 103(e)(4).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $103.5 million accomplished by decreasing DC's IC apportionment for FY 1977.

Stage Three

On August 7, 1978, Mayor Walter E. Washington requested the withdrawal of portions of the East leg and North Leg Freeways (I-295 and I-395).

On September 8, 1978, Federal Highway Administrator Karl S. Bowers and Urban Mass Transportation Administrator Richard S. Page approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4). The two route portions total 4.70 miles.

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $130.1 million accomplished by decreasing DC's IC apportionment for FY 1977.

Stage Four

On April 30, 1980, Mayor Marion S. Barry requested the withdrawal of a 1.7-mile segment of the South Leg Freeway portion of I-695 between I-66 and I-395.

On August 27, 1980, Federal Highway Administrator John S. Hassell and Urban Mass Transportation Deputy Administrator Lillian C. Liburdi approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4). In addition a 0.12 mile segment of I-695 was deleted from the Interstate System under Section 103(f).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $45.9 million accomplished by decreasing DC's IC apportionment for FY 1980.

Stage Five

On January 27, 1982, Mayor Marion S. Barry requested the withdrawal of the westerly 0.6-mile segment of I-266 between the Three Sisters terminus and Key Bridge.

On June 28, 1982, Federal Highway Administrator R. A. Barnhart and Urban Mass Transportation Administrator Arthur E. Teele approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4).
In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $10.8 million accomplished by decreasing DC's IC apportionment for FY 1982 and 1983.

Stage Six

On May 19, 1983, Mayor Marion S. Barry requested the withdrawal of (a) the remaining 0.51-mile segment of I-266 and (b) a 0.25-mile segment of I-66 within the I-66/I-266 interchange area.

On August 19, 1983, Federal Highway Administrator R. A. Barnhart and Urban Mass Transportation Acting Administrator G. Kent Woodman approved the withdrawals under the provisions of 23 U.S.C. 103(e)(4).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $12.9 million accomplished by decreasing DC's IC apportionment for FY 1983.
Withdrawal Value
The "Base" withdrawal value was based on the Federal share of the cost to complete these Interstate routes as reported in the Interstate Cost Estimate (ICE) at the time of the withdrawal. The Base cost was adjusted quarterly to determine a new withdrawal value in accordance with Section 125 of the Federal-Aid Highway Amendments of 1974 reflecting variations in the cost of construction. The adjustment due to construction cost variances was terminated by the Surface Transportation Assistance Act of 1982. These values are shown in the following table:

Withdrawal Value & Obligations -- Washington, DC
Stage One Base Cost (1975 ICE)304.3 million
Stage Two Base Cost (1975 ICE)300.6 million
Stage Three Base Cost (1977 ICE)403.5 million
Stage Four Base Cost (1979 ICE)230.4 million
Stage Five Base Cost (1981 ICE)110.2 million
Stage Six Base Cost (1981 ICE)121.8 million
Obligations for Highway Projects233.4 million
Obligations for Transit Projects1,963.5 million
Remaining Entitlement0.8 million
Final Withdrawal Value2,197.7 million




Map of Washington, DC Stage 1 Interstate Highway withdrawals
Map of Washington, DC Stage 2 Interstate Highway withdrawals
Map of Washington, DC Stage 3 Interstate Highway withdrawals
Map of Washington, DC Stage 4 Interstate Highway withdrawals
Map of Washington, DC Stage 5 Interstate Highway withdrawals
Map of Washington, DC Stage 6 Interstate Highway withdrawals
Map of Washington, DC Stage 7 Interstate Highway withdrawals


See some detailed histories here:

http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
http://wwwtripwithinthebeltway.blogspot.com/2014/09/getting-over.html
And see this as an example of how media entities over simplify the history- willfully.
http://wwwtripwithinthebeltway.blogspot.com/2015/01/the-washington-city-papers.html

Thursday, December 03, 2009

Peter S. Craig: RIP


Peter S. Craig, once an attorney at the Washington, D.C. law firm Covington & Burling and a member of the 'Committee of 100 on the Federal City' was an instrumental figure in preventing the construction of useful freeways within northern Washington, D.C., including a highly useful and environmentally responsive cross-town tunnel initially proposed by opponents of an earlier destructive alternative, resulting in a disproportionate amount of DC area traffic east of the Anacostia River
http://blog.eogn.com/eastmans_online_genealogy/2009/11/peter-s-craig-rip.html

Peter Craig passed away Thursday, November 26, 2009. He was both a Fellow of the American Society of Genealogists and a Fellow of The Genealogical Society of Pennsylvania. A brilliant genealogist, he was a friend to many, a prolific author on the Swedish Colonial Period in the Delaware Valley, and will be greatly missed.
According to The Washington Post
http://www.legacy.com/WashingtonPost/DeathNotices.asp?Page=LifeStory&PersonID=136594428

CRAIG PETER STEBBINS CRAIG, KNO, FASG (Age 81) Passed away peacefully after a brief illness on Thursday, November 26, 2009, surrounded by family in the Cleveland Park home he had lived in for more than 50 years. He is survived by his wife of 40 years, Sally; his children, Steve, Cary, Jenny and Katie; his brother John; four grandchildren; eight nephews and a niece; and countless friends. Memorial services will be held at 11 a.m., Saturday, December 19 at Gloria Dei Old Swede''s Church in Philadelphia, PA; and 4 p.m., Sunday, December 27 at the Friends Meeting of Washington. In lieu of flowers, contributions may be made to Community Council for the Homeless at Friendship Place ( www.cchfp.org ) or Crossings: Caring for Our Own at Death ( www.crossings.net ).
And from the Swedish Colonial Society
http://www.colonialswedes.org/Headlines/CraigPS.html

Dr. Peter S. Craig Receives Swedish Royal Honors


 Washington, D.C., 23 November 2002: Ambassador of Sweden Jan Eliasson (left) reveals the Badge of the Royal Order of the Polar Star to Dr. Peter S. Craig and Mrs. Sally Craig.

 Mrs. Kerstin Eliasson (left), Ambassador of Sweden Jan Eliasson, Dr. Peter S. Craig and Mrs. Sally Craig.

 Ambassador of Sweden Jan Eliasson (left) and Dr. Peter S. Craig, Knight First Class of the Royal Order of the Polar Star.


http://wwwtripwithinthebeltway.blogspot.com/2009/12/washington-post-continues-lying-about.html

Friday, April 24, 2009

The Doctrinaire Anti New Highways Position of the 1970s- Continued

Canceling highways because private automobile an obsolete concept by the 1990s...



-->
... This request is made because, from my review of the “Combined Corridor and Design Report”, it is obvious that Mr. Airis is proceeding from demonstrably erroneous or obsolete premises, errors that would be manifest if there were an adequate hearing. For example, his report proceeds from the assumption that there will be a 50 percent increase in area population by 1990 with a 100 percent increase in auto travel. Such an assumption is incredible in the face of (1) recent actions by EPA under the Clean Air looking toward the necessity of reducing future auto travel and (2) the growing fuel crisis which, according to Administration spokesmen, will lead to gas rationing within six months and, by 1990, may well render the private automobile as obsolete as the horse and buggy. Furthermore, it should be noted that the proposed six-lane South Leg is designed on the premise that at least 50 percent of the traffic utilizing it would come from two highly controversial (and unapproved) freeways- the [I-66] North Leg Freeway and the [I-266] Three Sisters Bridge."


The Doctrinaire Anti New Highways Position of the 1970s- Peter S. Craig

The Doctrinaire Anti New Highways Position- 'Green' Party

Tuesday, February 06, 2007

The Doctrinaire Anti-New Highways Position of the 1970s

Peter S. Craig

Statement of Peter S. Craig, Trustee, Committee of 100 on the Federal City. May 12, 1975
Peter S. Craig Papers ; Gelman Library Special Collections Division, G.W.U.
... Section 137(b) of the Federal-Aid Highway Act of 1973 (codified as 23 U.S.C. 103(4)), which authorized the Governor (Mayor Washington, in the case of D.C.), and the responsible locally elected officials (the D.C. City Council) to jointly request the U.S. Department of Transportation to transfer federal aid, formerly earmarked for freeways, for 80% of the cost of transit improvements. Such fund transfers may occur on either of two alternatives:

First, that the Interstate segment being deleted "is not essential to the completion of a unified and connected interstate System." The following un built freeways meet that test:

(1) North Central Freeway (70-S); Maryland has already abandoned 70-S (now I-270)

(2) Northeast Freeway (I-95); Maryland likewise has abandoned I-95 within the Beltway

(3) New York Avenue Industrial Freeway. This is not even on the Interstate System.

(4) East Leg of Inner Loop (I-295). Without an I-95 to Maryland, this is a freeway leading nowhere; the I-295 label should be returned to the already-constructed Kenilworth Avenue Freeway where it began.

(5) North Leg-West Section of Inner Loop (K Street Freeway)(I-66). This Council already has urged that Virginia abandon I-66 inside the Beltway in Virginia. Consistent with this action, I-66, within the city should also be scrapped. [DW note: that I-66 was actually built and opened in 1982]

(6) North Leg-East Section (Center Leg and I-66 to East Leg). Also not essential.

(7) South Leg, Inner Loop (-695). There are enough "95s" around and through Washington without adding this one. We have I-495 around the city and I-295 through it.

(8) Three Sisters Bridge (I-266). Even Virginia's State highway Department -- never distinguished for its concern for area residents (Virginians included), has concluded this bridge should not be built. With no Virginia connection, it would be a bridge leading nowhere.

(9) Georgetown Waterfront Tunnel (I-266) This segment is also not essential for an Interstate System, although (if properly tunneled and restricted in capacity) it may be desirable to achieve other urban goals.

Second, and independently of the first reason it, freeways may be deleted and the federal aid transferred to mass transit -- even if the freeway segment might be deemed essential for a "unified and connected Interstate system" if such freeway segment "would not be essential after completion of one or more substitute public mass transit projects." See 23 C.F.R. 476.304(3). All previously planned but un built freeways in D.C. meet this test. This has been adequately demonstrated by the numerous in-depth studies published by the Committee of 100 on the Federal City and other independent analysts.

Several red herrings have been raised concerning the flexibility of the federal-aid transfer provision. None, however, has merit. For example, former D.C. Highway Director Airis, wanting to construct the South Leg of the Inner Loop (under the Lincoln Memorial) [sic] claimed that fund transfers were not applicable in that case because there were no plans for rail rapid transit "in the same corridor"; i.e., between Theodore Roosevelt Bridge and the Southwest Freeway. The Act of Congress and the DOT regulations contain no such rigid requirement. To the contrary, the federal aid transfer authority may even extend outside the urbanized area of Washington. This was made explicit by the DOT regulations which provide (23 C.F.R. 476.314):
"The proposed projects must serve the urbanized area from which the Interstate segment is withdrawn, but need not utilize the same transportation corridor as the withdrawn segment and need not be physically located within that urbanized area."
Thus, theoretically at least, the South Leg of the Inner Loop could be removed from the Interstate System and the federal matching funds for this project applied for construction of an extension of Metro to Annapolis or the Eastern Shore. Such an extension, although outside the urbanized area of Washington, would nonetheless "serve the urbanized area" of Washington.

With this wide-open legal authority to get rid of unwanted freeways and to transfer that federal aid to public transit, it is remarkable there has been so little sign of activity at the District Building to implement this authority.

Over one billion four hundred dollars of federal aid is involved. It provides a vehicle, without Congressional action, to increase the ratio of federal aid to local participation for Metro from its present 2/3-1/3 [67/33] split to an 80/20 split. Without any increase in local participation (and local taxes) it offers an additional $840 million in federal aid for Metro. If the full $1.4 billion of federal aid for Metro were desired for transit improvements, the additional matching cost to local jurisdictions (D.C., Maryland and Virginia) would be $112 million. These funds may be spent anywhere -- not merely in the District of Columbia. They could hasten the day when the full 98- mile rail rapid transit system is operating as originally planned. They could also be devoted to purchases of new buses and other transit improvements.

There is no reason for the Council to wait, simply because the city administration has been delinquent on its promises to establish a city Department of Transportation under new and competent leadership. The time is overdue for people-moving, rather than car-moving, to be the primary objective of this city's transportation planning.

We therefore recommend that the Council immediately initiate the following actions:

1. Set a date for prompt hearings on amendment of the Comprehensive Plan to delete all un built freeways (with the exception of the Whitehurst Freeway -- pending completion of the Georgetown Waterfront Study now underway), including: South Leg Freeway, North Leg-West Section (K Street Tunnel), North Leg-East Section, New York Avenue Industrial Freeway, East Leg Freeway. (North Central, Northeast and Three Sisters Bridge Freeways were eliminated in 1968).

2. Enact a resolution directing the Mayor to request changes in the designated Interstate System reflecting the Council's determinations regarding freeways that should not be built.

3. Enact a resolution requesting DOT to transfer the Federal aid for the freeways thus "de mapped" to Metro, without limiting such transfers to segments within the District of Columbia. In other words, such transfers should be available for completion of Metro within suburban Maryland and Virginia as well as in the District of Columbia.


Committee of 100 on the Federal City
Letter of May 12, 1975; Elizabeth Rowe, Chairman

Dear Mr. Chairman and Members of the Council:

The Committee of 100 on the Federal City respectively requests early action by the Council on two very pressing transportation matters:

First the de mapping of unnecessary and unwanted freeways in the District of Columbia through amendment of the city's Comprehensive Plan and appropriate requests to the US Department of Transportation for the removal of such freeways from the Interstate system.

Second, the initiation by the Council, in cooperation with the Mayor, of a request to the U.S. Department of Transportation for the transfer of the federal aid formerly earmarked for such freeways (in excess of $1.4 billion) for completion of the presently-authorized Metro rail transit system.

These actions are necessary to implement two very pressing needs: First to remove forever the cloud of destruction and more autos in an auto-chocked city caused by the presence of obsolete freeway plans in the comprehensive plan and on the interstate system; and second, to help meet the escalating costs of construction of the Metro system.

Respectfully submitted,

Mrs. Elizabeth Rowe, Chairman