Showing posts with label Grand Arc Mall Tunnel. Show all posts
Showing posts with label Grand Arc Mall Tunnel. Show all posts

Sunday, August 27, 2023

Grand Arc Opportunity For New Hampshire Avenue/Maryland WMATA Line

The Grand Arc Project, my selection of a name for a project constructing a D.C. North Mall/Enclosed filtrated Underground North Central Freeway (electronically tolled Expressway), offers the tantalizing opportunity to add a new WMATA line along New Hampshire Avenue into Maryland.

Since the existing WMATA Red Line would be rebuilt underground, we have the opportunity for creating a new two track WMATA line spur, beneath the hill at New Hampshire Avenue, between the RR corridor and the DC-MD line.  Such a line would connect to and from the south with the Red Line, and the Grand Arc Project's inclusion of reconstructing the railroad underground provides opportunity to increase the number of WMATA as well as MARC/CSX tracks.  Squandering the opportunity would be unacceptable, and neglects the fundamental stage-ability: of starting with this new spur, at least to its nearest station, somewhere in Maryland, between the District line and the vicinity of Sheridan Street.  This is essentially a two block long segment of the 6 lane New Hampshire Avenue commercial strip zone, and a prime candidate for re-development.  This initial stop would be called Sheridan Station.  

This entire initial segment, including the portion within the District, would be underground. 

To the north, where the topography descends into the valley at Ray Road, its extension would transition to a bridge, perhaps as a lower level of a new span for carry New Hampshire Avenue over the valley.  Past that, it would enter its second tunnel segment to pass beneath the log established parking lot of Giant Supermarket

Have a second station in the southeast quadrant of the next main commercial area at the intersection with 410 East West Highway.   Likewise, place that segment underground.  Be sure to guarantee a guarantee of rent stabilization for the existing businesses in the strip malls, within the first level of the inevitable replacement development.

Owing to the topography, of the valley at Ray Road, this line could emerge upon its own narrow viaduct, and if a bridge was constructed to place New Hampshire Avenue atop that valley, place the new WMATA line as its lower level.  Have it transition to tunnel (cut and cover) extending beneath the existing Wendy's and north past East West Highway (Rt 410).

Where the topography again descends, either have it elevated, perhaps above the median of New Hampshire Avenue, or optionally, continuing it as trench & cut and cover, to a cut and cover segment towards and at the northeast quadrant of New Hampshire Avenue's intersection with University Boulevard, at the site of this line's 3rd initial stop- University Avenue Station.

Initial project would stop here, with its design fully anticipating a further continuation along New Hampshire Avenue to White Oak, by the U.S. F.D.A. Center, with the initial portion of a subsequent extension along the wide 6 lane expressway spec Route 29, with the next stop being at the commercial area alongside Rt 29 just south of Cherry Hill Road- fairly near to the Rt 29 interchange with MD 200/ICC Inter County Connector.  

As an option, examine the use of moled tunneling, to start near the DC/MD line, to see if such could extend under the various valleys.

Construction of the Grand Arc Project would provide some added rail capacity alongside the underground vehicular expressway, with the WMATA & MARC/CSX RR, each improved from 2 to 3 track operation.

Thursday, January 28, 2016

A Small Piece of the Grand Arc




New park along a segment of the Grand Arc right of way-
the NoMa Green

http://www.nomaparks.org/nomagreen/

The Park Details:

North of New York Avenue and bounded by Harry Thomas Way, NE, on the west and the Metropolitan Branch Trail (MBT) on the east, this large rectangular parcel of land is the best opportunity to provide an expansive open green space in the neighborhood. This project was a key component of the NoMa Public Realm Design Plan. With its adjacency to the MBT and strong trail connections, the NoMa Green site is easily accessible from many surrounding neighborhoods and development of this site as an attractive and active recreation area will help promote the safety and vitality of the trail. Community input into what is desired at this location has touched on an amphitheater, a strong connection to the MBT and grilling facilities. Other community participation identified tending a garden and walking through a meadow as desirable for the NoMa Green.

Grand Arc
http://wwwtripwithinthebeltway.blogspot.com/2015/01/grand-arc.html

A Better Future, A Different Future
http://wwwtripwithinthebeltway.blogspot.com/2012/01/terminator-2-alternative-ending.html


More on this at Greater, Greater Washington
http://greatergreaterwashington.org/post/29453/here-are-some-ideas-for-designing-nomas-new-park/#comments

Tuesday, July 21, 2015

Best Vista Along Grand Arc/I-95 Corridor Threatened By Misplaced Development Proposal


What would be the arguably best through the windshield vista anywhere along the U.S. interstate Highway System - on the unbuilt D.C. I-95 corridor where the topography descends -- threatened to be infringed upon by the latest horribly misguided developer's project within Washington, D.C.

The eastern portion of this developer project - by MRP Realty -- needs to be cut back.

 




http://www.bizjournals.com/washington/breaking_ground/2015/07/mrp-proposes-massive-development-for-rhode-island.html#g5


See the various tags below to become better acquainted with this matter.

Note that the Grand Arc plan would place the southbound lanes along the railroad's western side, emerging from a tunnel portal just south of Franklin Street.

Grand Arc I-95 at Franklin Street and Rhode Island Avenue area

 MRP Realty Plan- eastern portion infringes upon Grand Arc

In contrast, the dominant 1960s planning placed both directions of I-95 to the east of the railroad, denying this southbound vista to the public, for the sake of placing the highway further away from Catholic University of America.

Friday, June 19, 2015

WMATA to Continue To Push Corridor Chock

WMATA Profiteering at the Public's Expense- seeks to sell off transportation corridor land needed for rail expansion and underground freeway for yet more residential development.

Clearly, the concepts of transit oriented development is being perverted to restrict the publics mobility for the sake of short term profits.

From Aaron Wiener at the Washington City Paper:


Metro Offers Up Two Brookland Parcels for Development



brookland0

Nine months after picking a team to buy and develop a swath of land it owns near the Brookland Metro station, Metro is seeking to cash in on more of its land holdings in the neighborhood.

Today, the Washington Metropolitan Area Transit Authority, which runs Metro, offered up two Brookland parcels to developers. The larger parcel, at 21,094 square feet, is just a block south of the Metro station; the smaller one, at 16,239 square feet, is a block south of the first. Both consist of unimproved land—just grass, trees, and shrubs—between the Metro tracks and 9th Street NE.
The move follow's Metro's selection in August 2014 of a partnership of MRP Realty and the CAS Riegler Cos. to develop land just east of the Metro station. The developers there plan to build 280 residential units and 9,000 square feet of retail.

Today's solicitation contains few guidelines as to what developers can and should build on the sites. Given the increasing popularity of the neighborhood among young professionals and families, residential development is likely. Bids are due to Metro by June 19.

brookland
The southern parcel, at 9th and Kearny streets NE.
brookland2  

The northern parcel, at 9th and Lawrence streets NE

---

End this chocking off of vital transportation corridors.
Re-Map the B&O North Central Freeway- as promoted by the slain US President John F. Kennedy, with an update making it and the existing railroad underground beneath a new linear park.
http://wwwtripwithinthebeltway.blogspot.com/2014/01/cua-chock-continued-3.html

http://wwwtripwithinthebeltway.blogspot.com/2015/01/i-95-should-go-through-washington-dc.html
http://wwwtripwithinthebeltway.blogspot.com/2015/01/grand-arc.html









Thursday, January 01, 2015

Grand Arc

Washington, D.C.'s Future Northern Mall & Underground Railway and I-95-I-270E Multi-Model Parkland Roadway Tunnel Corridor
http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
http://wwwtripwithinthebeltway.blogspot.com/2008/02/grand-arc-mall-headpiece-union-station.html
http://wwwtripwithinthebeltway.blogspot.com/2008/02/monumental-and-mundane.html
Also see the park-river freeway tunnel project in Madrid Spain:
http://cos-mobile.blogspot.com/2011/05/madrid-spain-reclaims-riverfront.html


Building upon what might have been the JFK Vision.
 1962 quote

 "Significance of Using B&O Route. Use of the Baltimore & Ohio Railroad corridor to bring Routes 70-S and 95 into the city is the key to meeting the need for additional highway capacity in northern Washington, Montgomery County and northwestern Prince Georges Counties and at the same time avoiding the substantial relocation of persons, loss of taxable property and disruption of neighborhoods that would result from construction of the Northeast, North Central and Northwest Freeway proposed in the 1959 plan. Further savings are realized by placing the rapid transit line to Silver Spring and Queen’s Chapel in the same railroad corridor."


JFK B&O I-95 1962

Design proposals for Boston Inner Belt- JFK was originally from the Boston area.





The highway was scuttled following the JFK assassination:
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html

Whatever study that was to come out in summer 1963 fulfilling that vision probably was never released.

What was released in 1964: a monstrosity:

1964

A plan more compatible in 1966

1966

But which was subverted by the US FHWA in 1967-68 long enough to generate sufficient public opposition to politically mortally wound it by Dec 1968 with USNCPC reversal

Was last studied in 1971 with plan with some good ideas, yet introducing new objections

Fast forward to the 1990s.

A Trip Within the Beltway creator to be begins exploring un-built DC I-95 having been fascinated by it starting at the age of 9 with a 1972 visit to Washington DC, seeing the truncation, hearing the phrase no white mans homes through black mans homes from a hotel worker at the Howard Johnson in Cheverly, Maryland and wondering 'what about that giant power line right of way alongside and continuing past the I-95 truncation at the Beltway?  Studies the entire PEPCO-B&O route and wonders how such a highway could become so controversial and asks what about a revival upon a design update incorporating lessons learned here and elsewhere.

Studies the Boston Big Dig project, and by 1995 discovers the Grand Arc concept of a vast new green-way extending northward from the rear side of Union Station with underground highway connecting to the existing truncated I-395 Center Leg.

Writes about it in piece published in the July 1997 Takoma Voice.
http://wwwtripwithinthebeltway.blogspot.com/2007/07/volvos-subliminal-message-for-takoma.html

Explains how canceling DC I-95 transferred burden elsewhere and develops the Alexandria Orb as mitigation design for extra wide Capital Beltway in Alexandria Virginia which appeared on the front page of the Alexandra Journal December 18, 2000.
http://wwwtripwithinthebeltway.blogspot.com/2007/02/different-way-alexandria-orb.html
http://wwwtripwithinthebeltway.blogspot.com/2007/02/alexandria-orb-points_117140830358347894.html
http://wwwtripwithinthebeltway.blogspot.com/2007/02/alexandria-orb-page-one-news-december.html

Developed the Highways and Communities website inaugurated in April 2000- now available on Wayback Machine with history of the Washington D.C. freeway system, with the work incorporated into the blog inaugurated in December 2006- "A Trip Within The Beltway".

Devises revised JFK B&O I-95-I-270E plan with nearly fully buried highway carriageways buried beneath new Grand Arc Mall with heavy rail and the WMATA line under-grounded.

Corrects operation-ability issues of 1966+ design with insufficient tunnelization and capacity with new design that employs both sides of the railroad, particularly in Brookland with southbound lanes in new cut and cover tunnel directly alongside CUA beneath --- speaker of the house drive- thus making the spectacular view through the windshield at a portal immediately south of Franklin Street,employing under utilized lightly developed industrial properties between railroad and 9th Street thus increasing capacity while avoiding demolition of homes in Brookland along 10th Street that had been actively protested by anti freeway ECTC protester during the late 1960s.

Adopts a never officially considered alternative routing for the connection to the built Center Leg via a double level tunnel beneath O Street that would arc beneath the recreation field of Dunbar High School and the intersection of New Jersey Avenue and N Streets NW, reducing dwelling displacement from the 600+ of the 1971 plan for a cut and cover tunnel alongside the north side of New York Avenue to as few as 33, while providing superior geometry.

Extends the Washington, D.C. monumental core northwards from Union Station as the Grand Arc Mall headpiece, extending Union Station's walls as this new linear park's frame decorated in the style of the walls near the Capitol building, enclosing the freeway and railways- the latter with space for additional tracks, bringing the New York Avenue crossing to grade and overpassing Rhode Island Avenue before the rail-tracks adopt a gentler grade northwards to pass lower to descend into a bored tunnel past 16th Street in Silver Spring, to allow the Grand Arc Mall to pass at grade through the Brookland and Takoma area, with the WMATA rail climbing to employ the existing historic railroad overpass of Georgia Avenue.

Would extend the service roads flanking Union Station northward framing new linear park.

Would re-surface the Tiber Creek that had been covered over by the railroad and industrial development.

It would completely underground the I-395 or rather I-95 extension to a point north of Taylor street and again going underground to a split beneath a traffic circle at New Hampshire Avenue.  From there, I-395 or I-95 would tunneling along that Avenue's north side taking advantage of he open field of the Eastern Star Masonic home (where 110 houses where only recently erected in contempt), displacing some 27 pre-existing houses within the 1,600 foot long segment between the B&O - Grand Arc corridor and the District-Maryland line.  There the highway would emerge from beneath a new gateway traffic circle at New Hampshire and Eastern, and continuing as a combination of open trench and coverway for another 1,600 feet before swinging beneath and to the south of a new bridge carrying New Hampshire Avenue where the topography drops to swing onto the PEPCO corridor northward to the I-95 stubs at the Capitol Beltway.  

The I-270E extension meanwhile would continue via the B&O-Grand Arc corridor with a brief open trench before again entering a tunnel beneath the new linear park corridor passing beneath a Takoma Station Town Square, and into Maryland, where the WMATA red Line would emerge to rise up and employ the existing 16th Street overpass, with the heavy rail underground until just west of 16th Street., where the freeway would have a cut and cover spur northwards beneath 16th Street and Georgia Avenue, transitioning perhaps to a drilled extension, while the mainline would continue as part coverway - part trench to meet the Capital Beltway to and from the west.

Extra capacity upon that segment of the Capitol Beltway to the existing eastern I-270 spur could be provided by a widening that purchases the houses immediately alongside its south side for a new park covered cut and cover tunnel constructed before relocating the exiting Capital Beltway lanes likewise into a new cut and cover tunnel that would improve the geometrics while expanding Rock Creek Park.

Would be built with 4 separate carriageways underground south of New Hampshire Avenue, with the southbound lanes doublestacked in the cut and cover tunnel alongside CUA, and connect with both the Center Leg and the East Leg- the latter built as a box tunnel with new boulevard atop.
http://wwwtripwithinthebeltway.blogspot.com/2014/09/a-se-freeway-plan-benifiting-greatest.html



http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
http://wwwtripwithinthebeltway.blogspot.com/2012/01/grand-arc-95-270.html

 

Thursday, December 25, 2014

Rhode Island Avenue Area Encroachment Continued

Yet another thoughtlessly placed developer project
proposed to chock the I-95 B&O Grand Arc Corridor
at  http://www.usa.com/frs/805-809-channing-pl-property.html

Read more about Grand Arc: http://wwwtripwithinthebeltway.blogspot.com/2015/01/grand-arc.html


B&O railroad shown at lower left 
this turkey is a demolition special!

https://www.google.com/maps/place/809+Channing+Pl+NE,+Washington,+DC+20018/@38.9224752,-76.9938541,3a,52.5y,332.64h,89.36t/data=!3m4!1e1!3m2!1sNIZ2BbMO1zISPK58M9utMQ!2e0!4m2!3m1!1s0x89b7c7f61bea320b:0xf102296a55ff9a40!6m1!1e1
http://dc.urbanturf.com/articles/blog/douglas_proposes_295_units_in_two_buildings_near_rhode_island_metro/9296

Douglas Development is planning two six-story residential buildings near the Rhode Island Avenue Metro with a combined 295 units, according to a presentation made to ANC 5B this week.
The project at 805-809 Channing Place NE (map) includes a modern build-out of an existing industrial building as well as new construction. The existing building will become a six-story, 156-unit residence with six parking spaces; the new building will have 139 units and 60 parking spots. [NOTE only 66 automobile parking spots for 295 dwelling units!]  Neither project includes retail. The two projects would be connected by a pedestrian walkway topped by a pool and have large shared amenity spaces, including what’s labeled in the plans as a yoga studio, a juice bar and a fitness area. Eric Colbert & Associates, GTM Architects and Parker Rodriguez worked on various aspects of the project design.

Incoming ANC commissioner Joe Barrios indicated the project is a matter-of-right development that is likely to move forward without further approvals, and suggested it may be completed by early 2016.

“I am thrilled that blighted industrial land is being converted to much better use within short walking distance of the Rhode Island Avenue metro stop,” Barrios said. “This in turn will help fuel the revitalization of the Rhode Island Avenue corridor that many people in our community have been working on.” 

Joe Barrio seems ignorant of this corridor's significance.

We have plenty of dwellings.

But no radial highways within northern Washington, D.C.

And no northern linear park-lands in NE, as with Glover Archbold and Rock Creek Parks, with the nearest thing to such the McMillan Park Water Filtration Vaults likewise being threatened with needless development supported by the astro-turf "smart growth" lobbyists and the assorted new urbanist suck-ups.

Don't build I-95 quite like they were going to do during the 1960s along the railroad uncovered.

Rather build I-95 as part of a holistic project addresses the parallel railroad as well, and even re-surface the long buried Tiber Creek, somewhat akin to Madrid's M-30 project.

And STOP proposing the construction of new development projects placed too close to this railroad corridor.

Why can't the federal government take some initiative and treat Washington DC as the Nation's Capital, rather than some local medievalist fiefdom?

This Douglas Development project -- if built -- cries out for eminent domain tear me down!

Its yet another example of 'new urbanist'/new medievalist sell out to needless real estate developer profiteering.

JFK 1962
1971

 Grand Arc I-95
http://wwwtripwithinthebeltway.blogspot.com/2010/05/rhode-island-avenue-area-encroachment.html
http://wwwtripwithinthebeltway.blogspot.com/search/label/Demolition%20Specials
http://cos-mobile.blogspot.com/2008/02/going-below-big-roads-below.html
Way more needed then yet more real estate development chocking our transport-park corridors


http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
 http://wwwtripwithinthebeltway.blogspot.com/2015/01/grand-arc.html

Thursday, March 27, 2014

Takoma D.C. Chock 2014


New insanity to wedge 200+ dwellings in the tight street network around the neck of Washington D.C.'s sole railroad-industrial northern radial transportation corridor, with parking garage area built within needed right of way enhancement.  Has the support of the moneyed organizations that are pro-development/indifferent to hostile to transportation.  To be voted upon today, March 27, 2014


Project impinges upon  existing WMATA station parking and transit potential of site, while adding traffic to the over-stressed narrow streets.

Parking garage area conflicts with the legitimate North Central Freeway/Grand Arc Mall Tunnel right of way.

Was voted unanimously by WMATA- leading support to the idea that WMATA perhaps should be abolished or folded into a comprehensive transportation related entity.



http://www.takomametro.com/

Monday, January 27, 2014

CUA Chock Continued 3 ...


Idiotic chock of Washington D.C.'s main northern radial transport corridor also disregards need for 3rd MARC trackway.  See

www.actfortransit.org/archives/publications/TransitTimes-V28-1-Jan2014.pdf
This talks about the need for a THIRD railway track for MARC trains via the Metropolitan Branch corridor.   From the above actfortransit url:
Another project to pay attention to is a third track for the Maryland Area Rail Commuter (MARC) Brunswick Line. CSX moves its freight trains in this corridor, and to move more passenger trains requires a third track. Add in that Frederick County is expected to grow 36% by 2040 (forecast from Metropolitan Washington Council of Government), and it is clear we must have more capacity. We need to make sure we reserve right-of-way and ask the state to start putting in a third track to accommodate more passenger traffic. In addition,we need to keep an eye on the money − money spent to widen I-270 [sic- fight the cigarette protectionist 'drug war' pharmacratic Inquisition] would be money not available for transit.



Wednesday, December 25, 2013

CUA Chock Continued 2 ...

Misguided proposal to sell off WMATA Red line Bus Bay Area, in opposition to WMATA's sensible point to NOT sell off this property...


 http://greatergreaterwashington.org/post/21118/brookland-neighbors-ask-metro-for-development-with-a-side-of-green/#comments

 http://brooklandbridge.com/8424/save-the-brookland-green-and-support-smart-development-sign-this-petition/

Yet to be approved comment at "The Brookland Bridge"

Don’t build so close to the railroad- such is Washington D.C.’s only main transportation corridor and is the legitimate location for I-95, with Madrid Spain showing the proper way for such a highway as a park covered tunnel.

http://cos-mobile.blogspot.com/2011/05/madrid-spain-reclaims-riverfront.html
http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
http://wwwtripwithinthebeltway.blogspot.com/search/label/Demolition%20Specials

---

Tunnel Box

Tunnel box allows superior space utilization for freeway and adjoining development, with sound & pollution containment of tunnel ideal for accommodating greater real estate development within close proximity

Tuesday, December 03, 2013

CUA Chock Continued ...

 ... more of this chock the transport corridor, right in what's supposedly the Nation's CapitAl City, chocking the un-built I-95 corridor alongside Catholic University of America
Oxbridge Group Meeting 


Such properties are part of a transport corridor being irresponsibly sold off for ill placed real estate development.

Tunnel Box

Tunnel box allows superior space utilization for freeway and adjoining development, with sound & pollution containment of tunnel ideal for accommodating greater real estate development within close proximity



Tuesday, January 22, 2013

ArtsSpace - CUA Chock Continued ...

Impedes the right of way along the western side of the B&O Metropolitan Branch Red Line Corridor, blocking the south-bound lanes of D.C. I-95 via the Grand Arc design

Pictures from Beyond D.C.  http://beyonddc.com/log/?p=4331






Arts Walk right of way violation

Riverside Drive extension with future NY West Side Highway Tunnel -
technology suitable for the Washington D.C. I-95 Grand Arc project segment alongside CU, with southbound tunnel lanes beneath  John McCormack Drive and through Arts Walk


Arts Walk D.C. I-95 Grand Arc Chock
http://wwwtripwithinthebeltway.blogspot.com/2012/02/artsspace-chock.html


Monday, April 09, 2012

Continually Ignoring Un-Built D.C. I-95 - 3

Nice of the Washington Times to run an editorial titled "Freeways are the solution to congestion" without mentioning any of the still un-built freeways within the Beltway, particularly in Washington, D.C., though dissing the concept of tolling which would make such new freeways more fund-able



http://www.washingtontimes.com/news/2010/apr/09/freeways-are-the-solution-to-congestion/

As is the case in major metropolitan areas throughout the country, congestion plagues Northern Virginia. The constant traffic snarls impede business, pollute the environment and generally make living in the region an unpleasant experience.

This doesn’t mean - as the Fairfax County Chamber of Commerce suggests - that toll roads are in any way a solution to the problem. To the contrary, a toll road’s financial survival depends upon perpetual congestion in the road network as a whole.

The explanation is straightforward. Given alternative routes without traffic, no rational consumer would fork over his hard-earned cash to take a tolled highway. Purportedly “innovative” public-private partnerships ensure that this situation never exists by securing non-compete contract clauses that either directly prevent or indirectly discourage improvements to nearby free roads. Happy commuters are not paying customers.

Take the Capital Beltway high-occupancy toll (HOT) lane deal between the Virginia Department of Transportation (VDOT) and the tolling firm Transurban. Under section 9.02 of the contract, improvements made to the Beltway’s general-purpose lanes without Transurban’s permission trigger “compensation events.” This scheme forces Virginia taxpayers to pay ransom to the Australian firm before the free lanes can be widened within the next 80 years. The payment would be based on an estimate of the financial loss to the tolled lane from improvements to the free lanes.

This is the equivalent of Ford customers being forced to make payments to Toyota if improvements to the American product attracted customers away from the Japanese marque. Nobody would consider such an arrangement to be in any way free-market. Nor is market competition involved when a private foreign corporation profits on the backs of taxpayers after taking federal and state grants, loans and guarantees subsidizing 82 percent of the project’s total cost.

That sum, including tolls paid over the lifetime of the scheme, amounts to billions more than it would have cost the public to construct the same lanes as part of a traditional freeway. The construction of additional free-lane capacity is the only permanent solution to gridlock.

Local bureaucrats steadfastly have opposed adding new capacity. Instead, officials kowtow to special interests infatuated with the concept of spending other people’s money - in this case through motorist user fees. No better example of this can be found than the $5.3 billion that drivers will pay to subsidize the Dulles Metrorail extension, not counting the billions more in cost overruns, financing charges and operational subsidies over the project’s lifetime.

Fortunately, Northern Virginians can look forward to a small bit of relief on Interstate 66 inside the Beltway. This summer, VDOT will begin a modest project expanding the overloaded highway’s capacity, starting with the stretch between Fairfax Drive and Sycamore Street. Commuters should thank Rep. Frank R. Wolf, Virginia Republican, for his persistence in driving this project over the objections of the not-in-my-backyard crowd.

This road carries 110,000 vehicles to and from work every day, and the first phase of Mr. Wolf’s project will cost just $19 million. By comparison, the Federal Transit Administration estimates that the Dulles rail project will benefit about 35,000 persons on weekdays - meaning the cost for each regular user will be $150,000.

Unless this region puts a stop to these wasteful transit boondoggles and tolling schemes, the congestion will only get worse.


---

OK then- how about the Washington Times calling for constructing the I-270E/I-95 Grand Arc Mall Tunnel, under-grounding the B&O Metropolitan Branch RR, I-95 PEPCO connector, crosstown I-66 K Street New York Avenue Tunnels, and augmented Center Leg/under-grounded SW-SE Freeway?

How about protecting the Center Leg (3rd Street Tunnel) from ill advised details that would squander its design capacity, of otherwise sensible real estate development projects.

How about ensuring that SW re-development preserves the space for USNCPC's excellent Washington Channel Tunnel concept?

Friday, February 24, 2012

Tiber Creek Transition to Be Covered by "Washington Gateway" Project

While Rail-Road wall remains uncovered

"Washington Gateway" Demolition Special project to Cover Over Best Spot for Transitioning a restored resurfaced Tiber Creek from the Grand Arc via a new waterfall

http://wwwtripwithinthebeltway.blogspot.com/2008/08/washington-gateway-chock_11.html

Preliminary ground work reportedly underway (GGW- Feb 23, 2012).



Creek was buried by the construction of the B&O Metropolitan Branch project that included Washington, D.C.'s Union Station, which has since marked the boundary of monumental core.

Thursday, February 02, 2012

ArtsSpace - CUA Chock

1966 B&O North Central Freeway


B&O Corridor- Now & Future?

See the two buildings jammed closest at left to the RR; and the alongside open space.

Also see: http://wwwtripwithinthebeltway.blogspot.com/2010/04/artspace-demolition-special-april-30.html

New insane development from the people that built the 'Artspace' boondoggle demolition special, to block Washington, D.C.'s sole grade separated transportation corridor.

From the Brookland listerve:
We learned yesterday that the open green land at 9th & Kearny is up for sale.

A "Bankers Realty" informed us that the space is in Square 3831 & is made up of 4 Lots (0042, 0043, 0044 & 0045).

Their asking price is $1.2M.

We checked DC's real estate records which show all 4 lots are owned by DC & they add to $ 508,080 in assessed value.

However, there are 5 other lots (0018, 0038, 0039, 0040 & 0041) in that Square which were purchased on 11/30/11 (at $359K each) by Inle Development LLD with a 20015 zip code P.O. box.

Bankers Realty also informed us that the 4 purchased Lots now on sale (Lots 0042-45) were not purchased by Inle Development & that DC's ownership records (showing DC as the owner) would be fixed after a sale.

Currently, the owner for all of these lots is shown as "Brookland Artspace Lofts, LLC" & they are zoned "C-M-1."C-M-1 allows only 3 stores totaling 40 feet in height.

Apparently, Brookland Artspace Lofts bought both land on both sides of the tracks.

The Office of Zoning map was revised yesterday morning and does not reflect who the purchaser of the 4 Lots from DC is. We are attempting to determine if DC in fact sold these 4 Lots &, if so, thru what land disposition process, when & to whom. We are gravely concerned that these sales (and the implications therein) are a direct result of the Col. Brooks 7-story C-2-B application. Worse, we recognize the inevitable quality of life annihilation for the most directly affected 5A07 property owners who will have to contend with a 7-story apt. building 10 to 200 feet from their property and likely much, much more. Real Property Assessment Database:

https://www. taxpayerservicec enter.com/ RP_Search. jsp?search_ type=Assessment.

You'll need to put in Square 3831 to see Lots 0042, 0043, 0044, & 0045.

Very kind regards,

Commissioner Carolyn C. Steptoe
SMD 5A07
(202) 556-5886 - ANC cell






1966


1971

The 1966, 1971 (and of course the 1964 and 1960) plans placed B&O I-95 entirely on the railroad's eastern side, rather then the industrial corridor to the west along the east side of 8th Street which the Artspace Building being the first example here of this wasteful phenomenon of Transportation Corridor Demolition Specials.


Looking South Along 8th Street NE with Franklin Street Bridge


This owed to a basic failure to consider placing some of this freeway on the railroad's western side via the cut and cover tunnel beneath today's "John McCormack Drive". Such a tunnel would be mandatory for containing traffic noise, owing to the proximity of Catholic University of America- in the fashion of the future West Side Highway Tunnel beneath Riverside Drive in Manhattan, N.Y. , and Boston's Central Artery Project.

Washington D.C. un-built I-95 corridor alongside John McCormack Drive/Catholic University of America


Future Northbound West Side Highway Tunnel Beneath Riverside Drive


Boston I-93 Central Artery Tunnel

The 1960 I-95 Northeastern Freeway study* [*prior to the adaptation of the B&O "Y" route with I-70S, I-95 was to be the "Northeastern Freeway" with a separate "North Central Freeway" roughly along Georgia Avenue] considered and rejected a non-tunneled route along the railroad's west side as essentially too intrusive to CUA.


1960

The infamous 1964 report that deviated from JFK's 1962-63 planning, considered and rejected B&O route variants featuring an I-95 elevated directly atop the railroad for the same reasons.

1964

The 1966 'supplementary' report proposed a deck from Taylor Street to Irving Street atop, with new development extending to 10th Street NE in Brookland.


1966

Note, that the 1966 plans show the presence of a CUA building that has since been demolished, freeing up the "John McCarrick Drive- 8th Street NE" southbound I-95 Tunnel.

1966


Federal Legislation is imperative to save this corridor from impending ill-placed development.

1960
http://wwwtripwithinthebeltway.blogspot.com/2006/11/1960-northeast-freeway.html


1962
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html

1964
http://wwwtripwithinthebeltway.blogspot.com/2006/11/1963-64-north-central-freeway-study.html
http://wwwtripwithinthebeltway.blogspot.com/2008/05/1964-north-central-freeway-report-je.html
http://wwwtripwithinthebeltway.blogspot.com/2012/01/pin-point-b-rr-in-dc-only-after-more.html

1966
http://wwwtripwithinthebeltway.blogspot.com/2006/11/1966-north-central-freeway.html

1971
http://wwwtripwithinthebeltway.blogspot.com/2006/11/1971-deluew.html