Friday, January 09, 2015

Answering a Critic



       B&O-PEPCO I-95

See comments at:  

The only thing that hasn't changed in the last 40 years in the corridor in question is that nobody wants this highway?!  *Nothing* in them is valid anymore?!-  

A baseless claim, regarding a later freeway routing option.  One on the books for only a few months in 1973; at the tail end of a crafted controversy against its connecting segment within the District; that itself was relatively uncontroversial, until becoming highly politicized for reasons unrelated to its basic feasibility.

It's the same right of way.  The same topography.  Virtually the identical development, with the one main difference being that eminent domain special development upon the connecting segment just inside the Distract: the Comstock ‘Hampshire’s’ project.  Which anyone buying into was warned via my blog, so they knew they were buying an eminent domain demolition special that should have not been approved. 

It's a different generation.  One that has seen the fallacy of pretending that WMATA serves as a substitute rather than a supplement to highways  40years after the wholesale cancellation of the unbuilt inside the Maryland Beltway freeway system - resulting in some of the worst traffic problems in the US!  One that may be far more skeptical of the whole idea that a nation as rich as the U.S.somehow HAD to de-map the freeway system to fund the WMATA system- particularly given the 100s of billions squandered in the drug war.   And one that may be aware of more innovative urban highway projects elsewhere done right to blend into the urban fabric in a more benign indeed complimentary fashion from Boston, Massachusetts, to Madrid, Spain.  In a state where highway expansion - dualizations and grade separations - have been derided as a simple means to fund what may be worthy transit projects - the Maryland election of a new Governor with votes from areas acknowledged as favoring better highways and questioned the simple prioritization of transit at the expense of highways may portend a change, perhaps on a broader scale: that perhaps we should re-think certain transit projects, either defer them, or at least work out some better financing from the new development that would rely upon them, to lessen the financial burden on official budgets in areas that have not simply deferred highway projects, but rather pretended that such should never be built.

Also, completing an unwanted plan is pretty much the worst justification for a project ever. I am completely aware of what these old studies were advocating. They were widely rejected for a host of reasons.

Unwanted by who, what, and why?   

http://wwwtripwithinthebeltway.blogspot.com/2007/02/sampling-of-attitudes-towards-dc-i-95.html

The PEPCO I-95 extension plan was the result of popular sentiment against the longstanding plan, from the 1950s to February 1973 for the inside the Beltway I-95 extension via Northwest Branch Park routing.  That plan would have taken about 100 acres of parkland along a stream, plus about 110 residences in Maryland, entering the District via the Fort Drive right of way, taking 0 homes there between Gallatin and Galloway Streets- and was opposed within Maryland for the parkland stream corridor impacts.  The PEPCO I-95 alternative first appears only in the 1971 Deleuw, Cather, Weese study, and was written up highly favorably for using an existing non stream corridor 250 foot wide clear-cut, so noting the feasibility of re-aligning the power-lines, including the option of burying them, and the superior geometry of the new Hampshire Avenue corridor extension connecting with North Capitol Street and Missouri Avenue providing better serviceability access into the north-south and east west street grid into northern Washington DC.

I ask yet again, what travel demand would this project satisfy? That couldn't be addressed with widening 295? Where will all these cars park? Why should thriving neighborhoods be destroyed to save a guy from Columbia a few minutes commuting time?

Service into, and for northern Washington, D.C. as well as through traffic.  Widening I-295 (and hopefully modernizing it with full shoulders and some cut and cover tunnels as local mitigation) can serve the latter but not the former.  To go through SE to get to NE or NW?  Why must traffic go way out of its way through a poorer area that still awaits mitigation, while dismissing largely cut and cover existing right of way links into wealthier areas?

Neighborhood destruction?  It’s almost entirely existing right of way.   But for the final 1600 feet between its southern end and the District line, the PEPCO right of way is all of the 5.3 mile length from the beltway to the District line, with that final stretch consisting of retail strip properties.   What neighborhoods, asides from a portion of such along the north side of New Hampshire Avenue, primarily along a less than one block segment of Eastern and Rittenhouse, consisting of only 27 mid 1900s brick houses within the next 1,600 foot extension between the Maryland-District line and the B&O corridor.  Oh yes, the brand new Comstock town-house project ‘The Hampshires’ just erected in the past two years- based upon purjurous testimony by USNCPC that did not even mention the transportation corridor significance- consisting of 110 new dwellings- with inhabitants that should have known about from this blog by simply doing an internet search upon what they were buying into.  Whether the figure is 27 or 27 plus the bulk of that Comstock eminent domain special, the figure is a low number to connect a some 5 mile right of way with that railroad industrial corridor that only requires another 30 or so for a total of 59 for the entire highway from the Beltway to the confluence of the B&O and New York Avenue- plus whatever is now being built looking to make a quick profit off of new dwellings that should have never been approved.

I don't understand the hostility you have for the neighborhoods and institutions that have been in place for over 100 years. Why should anyone consider displacing CUA for a highway?

What hostility for neighborhoods in general?  I have written that I oppose the earlier plans such as I-66 via a new swath through thousands of dwellings along Florida Avenue and U Street, and versions of the North central freeway likewise along Georgia Avenue, along with the infamous 1964 routing on a longer route away from the railroad through Takoma Park in 1964.  And I have written not to simply revive the plans as evolved radically from the 1950s to the 1970s- compare the 1950s version of the I-66 North leg and the replacement K Street Tunnel  plans as an example- but rather take the design evolution further to reduce impacts and improve operation-ability – such as connections between the proposed K Street Tunnel and the effective center leg extension to the northeast, relocating cut and cover tunnel segments respectively partially and fully alongside New York Avenue displacing 148 and 600+ (or rather 550+ as Mayor Anthony Williams tore some down about 15 years ago) to respectively entirely under the avenue taking 0 for an independent continuation of the I-66 tunnel, and as few as 33 for I-395 (I-95) with a tunnel arcing beneath the intersection of new jersey Avenue and N Street transitioning to a double deck configuration beneath O street, providing a 95% reduction in displacement with a gentler-superior transition radii- vital in a curved tunnel segment.   

See: http://wwwtripwithinthebeltway.blogspot.com/2007/11/i-395-extension-superior-option.html

Nonetheless that alternative has gone entirely unconsidered in the 1996+ Ron Linton I-395 tunnel extension planning despite its inferior geometry.  If anyone is being hostile, it is your position with regard to SE of the Anacostia.

Not institutions but rather institution.  

It was JFK that radically reshaped the transportation planning after the 1959 Mass Transportation Plan, greatly increasing the proposed rail transit system and significantly reducing but not eliminating the proposed freeway system to greatly reduce the impacts.

A main point of that was the reduction of three separate northern freeways with a single 2 into 1 “Y” route via the route with the least impact from the November 1962 report:
"Significance of Using B&O Route. Use of the Baltimore & Ohio Railroad corridor to bring Routes 70-S and 95 into the city is the key to meeting the need for additional highway capacity in northern Washington, Montgomery County and northwestern Prince Georges Counties and at the same time avoiding the substantial relocation of persons, loss of taxable property and disruption of neighborhoods that would result from construction of the Northeast, North Central and Northwest Freeway proposed in the 1959 plan. Further savings are realized by placing the rapid transit line to Silver Spring and Queen’s Chapel in the same railroad corridor."

1962 B&O Route 
with I-95 routed from the northeast via the Fort Drive routing 
connecting with that via Northwest branch in Maryland

That was a key point.  A study report on this was due sometime in the summer of 1963.  JFK and his wife meanwhile had an interest in urban planning; and he was likely aware of that at that time for the proposed Boston Inner Belt which featured proposed designs for partially encased box tunnel segments beneath new pedestrian promenades.    As JFK was from Boston and undoubtedly somewhat familiar with that area along with that alongside Catholic University of America (where the road there today is named after the 1962-1971 Speaker of the House, John William McCormick), I can wonder if he ever envisioned a design like that for alongside CUA.

 1963 Boston Inner Belt: park atop highway tunnel segment


1965 Boston Inner Belt: park atop highway tunnel segment

1966 D.C. I-95 North Central Freeway with cover alongside Catholic University of America

John W. McCormack

Whatever the case, no report upon that freeway would come out anytime in 1963.  The report that finally emerged in October 1964 was a mockery of the B&O route concept.  It had 37 routes all over the map.  Its recommended route #11 largely followed the B&O, but with serious deviations in Brookland and especially Takoma, creating a huge firestorm of controversy-opposition.   



 October 1964 North Central Freeway report
OVERVIEW
http://wwwtripwithinthebeltway.blogspot.com/2006/11/1963-64-north-central-freeway-study.html

REPORT - PLATES

http://wwwtripwithinthebeltway.blogspot.com/2008/05/1964-north-central-freeway-report-je.html

REPORT - FULL TEXT & CHARTS (Complete)
http://wwwtripwithinthebeltway.blogspot.com/2012/02/october-1964-north-central-freeway.html

REPORT - ON THE B&O ROUTE
'PIN POINT THE B&O CORRIDOR ONLY AFTERWARDS'

http://wwwtripwithinthebeltway.blogspot.com/2012/01/pin-point-b-rr-in-dc-only-after-more.html


 1966 North Central Freeway

http://wwwtripwithinthebeltway.blogspot.com/2006/11/1966-north-central-freeway.htmlhttp://wwwtripwithinthebeltway.blogspot.com/2006/11/1966-north-central-freeway.html

By November 1966 a ‘supplementary’ study report is released with a basic routing and design akin to the 1962 planning though little in the way of anything more exotic as the above mentioned promenade covered Inner belt box tunnels, though including one plate showing a potential decked over area alongside CUA and a little bit further south.  See the image captioned  “I-95 B&O North Central Freeway next to Catholic University of America” within: 


Then see what happened in 1967 after the controversy had died down only to be again inflamed by the then new UFHWA waffling between the infinity less opposed 1962/1966 planning and the infamous 1964 planning, as explained by this June 1, 1967 letter from Takoma Park resident Duncan Wall to Maryland Governor Spiro Agnew:
Citizens of Takoma Park and Silver Spring had reason for their demonstrations of bitter dissatisfaction with the highway authorities of your predecessor's administration. After we had been given reason to believe that the causes of our protests had been in at least some part overcome, the matter now threatens to break into renewed bitterness. I am sure you will wish to avoid this as much as many of us.

We showed that the methods of traffic projections which were claimed to justify the North Central were fallacious, the results in error by as much as 400 percent. Our contention was tacitly admitted in "re-studied" versions of the proposal made public last year, sharply reducing the original plan of 5 lanes each way.

The re-studied proposal also tacitly admitted that the route first proposed was needlessly, even carelessly if not ruthlessly, destructive of our communities. The new version hugged both sides of the existing Baltimore and Ohio railway, thus avoiding a new swath of destruction to divide our communities and sharply reducing the number of homes to be taken.

The reduced, re-routed proposal was made public last year with endorsement of D.C. And Maryland highway authorities. The D.C. Portion was forced through the National Capital Planning Commission by votes of representatives of the D.C. Highway Department and of the U.S. Bureau of Public Roads. From this we concluded, reasonably enough, that the highway authorities of the two jurisdictions (Maryland and D.C.) had reached a firm understanding with the Bureau of Public Roads.

Many of us were therefore astonished and aroused to preparations for renewed protests when Washington newspapers recently reported that the Bureau has acted to open it all up again. We have not found the Bureau forthcoming with candid information, but the press articles intimate an intention to force Maryland to accept modifications of route or design ostensibly "cheaper."

The result is that the whole controversy, which had been somewhat quiescent, is beginning to agitate the communities again. I can assure you this is so, for although I recently resigned chairmanship of the Metropolitan Citizens Council for Rapid Transit and write this simply as an individual citizen who wishes your administration well, I do remain in close touch with neighborhood sentiment on transportation-related issues.
Now- why would the planning so disregard that key point of the 1962 JFK plan?

Such inflaming of opposition would be sufficient for two main entities necessary for approving the highway to reverse their long standing support for the freeway by the end of 1968. Thus, what we have was a manufactured opposition, to a freeway that had previously been not very controversial.     

Now which entity holding which property alongside the B&O route would be that with the motive and the ability to bring these events about, particularly for something that JFK had endorsed a year prior to his assassination and which was clearly botched and scuttled in the following years? 



 






http://continuingcounterreformation.blogspot.com/2014/09/a-most-telling-selection-of-style-of.html

Which entity as an example would likewise have the motive and ability with the scuttling of the 1990s USNCPC proposal for a South Capitol Mall, of which the only significant building in its path was St Vincent de Paul Roman Catholic Church?!  To read much more about that please see my companion blogs:


To see more history about the manipulation of the planning, see:


Consider the time-line, as well as the history of that medievalist entity, particularly its manipulations on a greater scale; see:
 

It is notable that manipulation of public opinion regarding DC I-95 is never mentioned as a possible motive for what happened to the last U.S. President to show such an interest in urban planning; perhaps that is why his best known quote remains: ask not what your country can do for you, ask what you can do for your country.  No I never said that CUA should be displaced by a highway- instead it would run alongside in a cut and cover tunnel.  But given the histories, perhaps that charge of yours is some sort of Freudian slip of how the public would feel if they knew the hidden story?  Notably have we yet since had a U.S. President show such an interest in urban planning?

Do you have any idea what it would cost to put a highway and a railroad underground through DC? My offhand guess is that rebuilding the corridor in the manner you describe would cost upward of $20 billion. Likely more.

Perhaps, perhaps not.  But the benefit would be immense.  Not only would there be this highly useful highway for regional travel, additional highway benefits for locals with some extra ideas not included in any of the earlier planning- such as new linear surface roadways flanking the new linear park from Union Station northwards, plus a 410 East West Highway bypass around Takoma Park, via a set of lanes from where EWH crossing the PEPCO corridor southward and then northward along the B&O to a set of center loader tunnel ramps emerging past Georgia Avenue.  

Center loader ramps are an atypical design that I have seen only with the redesign of the southbound I-395  Center Leg on ramp with the current “Capitol Crossing” air rights project.  Center loader means that the access ramp to or from a freeway ramp is towards the center rather than off to one side of a surface street.  This eliminates the freeway related traffic conflict with pedestrians and cyclists by routing this heavy traffic towards the center of a road.  See:


The linear park would be essentially a northern extension of the national mall, and would provide a linear park in a part of the District denied such over a century ago by the initial construction of he railroad- which remember was built in a stream valley long paved over.   The linear park could even include a resurfacing of that stream the Tiber as a component.  

Yet somehow the USA is too poor to do that, as we ought to not question the 100s of millions wasted upon the war on drugs.

That was an idea in part established via the law firm associated with Peter S. Craig, of Covington & Burling.   Founded by a one time Congressman, Federal Judge and Georgetown University Law professor, the law firm of Covington & Burling played a major role in the political campaign to convince people that we could only fund transit by de-mapping the proposed freeway system, and just happens to be perhaps the largest legal representation for the very industries that thrive off such policies- Tobacco and Pharma: 

http://wwwtripwithinthebeltway.blogspot.com/2009/10/ectc-paid-to-riot-via-covington-burling.html

http://wwwtripwithinthebeltway.blogspot.com/search/label/Covington%20and%20Burling

http://freedomofmedicineanddiet.blogspot.com/2011/10/jh-covington-upheld-harrison-narcotic.html

http://freedomofmedicineanddiet.blogspot.com/2012/12/the-evil-prohibition-to-promote.html


I also take it that you've not been to NE any time recently. Do you live in DC? Or the region, at least? If not, I have nothing more to say to you than the following:


1. I certainly agree that DC being treated as a fiefdom (by Congress) is tiring. Maybe you should refocus your blog to advocating for DC Statehood so the District has true homerule. Or maybe you should just refocus your fantasies on wherever it is that you live. DC doesn't need you.

2. Whatever you do, don't quit your day job to become a highway engineer or transportation planner. You wouldn't last long, at least not in this century. I'm glad your hobby keeps you busy, though.

I first visited DC as an infant but my earliest memory is a family trip in 1972 when I first saw the I-95 stubs and was told by a hotel bellhop that was over opposition to ‘white mans road through black mans homes’ and found myself wondering about that wide power-line right of way: an early lesson about the intoxicating effects of simple slogans.

I lived in the area from 1991 to 2004.  I last visited the area in 2013.

You may see some of my highway planning efforts at this blog’s tag about the Alexandria Orb- designed to mitigate the effects of the de-mapping of DC I-95's impacts upon an area consequently receiving far more traffic- where I saw U.S. NCPC which adheres to that de-mapping turn their back, much like they do with the neighborhoods along the Anacostia Freeway in SE.


What happened with the scuttling of the JFK B&O D.C. I-95 and the South Capital Mall speaks volumes of the true nature of this fiefdom. 

By the way you failed to answer my previous question- are you connected with WMATA?

There's a WMATA Financial Officer with your name- Tim Winslow.

http://www.zoominfo.com/p/Tim-Winslow/1973554138

https://www.linkedin.com/in/twinslow

Both educated at St. John's.

If that's you, perhaps you shall be the one who ultimately signs the checks paying back the funds that were transferred during the 1970s?

Wednesday, January 07, 2015

Choking The D.C. B&O Grand Arc/I-95 Corridor

B&O-PEPCO I-95






I-395/I-95 Grand Arc

Brookland-CUA Over Development


http://wwwtripwithinthebeltway.blogspot.com/2008/08/washington-gateway-chock_11.html
http://wwwtripwithinthebeltway.blogspot.com/2014/12/rhode-island-avenue-area-encroachment.html
http://wwwtripwithinthebeltway.blogspot.com/2009/03/washington-dc-unanimous-cave-in-on.html
http://wwwtripwithinthebeltway.blogspot.com/2013/01/artsspace-cua-chock-continued.html
http://wwwtripwithinthebeltway.blogspot.com/2012/02/artsspace-chock.html
http://wwwtripwithinthebeltway.blogspot.com/2010/04/artspace-demolition-special-april-30.html
http://wwwtripwithinthebeltway.blogspot.com/2013/12/cua-chock-continued-2.html
http://wwwtripwithinthebeltway.blogspot.com/2014/01/cua-chock-continued-3.html
http://wwwtripwithinthebeltway.blogspot.com/2013/12/cua-chock-continued.html
http://wwwtripwithinthebeltway.blogspot.com/2008/05/cuabrookland-transport-corridor-chock.html
http://wwwtripwithinthebeltway.blogspot.com/2015/11/cua-brookland-corridor-chock-continued.html


I-395/I-95 New Hampshire Grand Arc-PEPCO Connector

New Hampshire- Eastern Star Demolition Special Project

Profits over people- screwing the general public to make a quick buck

http://wwwtripwithinthebeltway.blogspot.com/2011/02/us-ncpc-perjury-2006.html
http://wwwtripwithinthebeltway.blogspot.com/2011/07/eastern-star-dc-i-95-chock.html
http://wwwtripwithinthebeltway.blogspot.com/2013/07/eastern-star-2013-waste.html
http://wwwtripwithinthebeltway.blogspot.com/2013/01/constitutional-power-can-free-us.html







Tuesday, January 06, 2015

Choking The I-395 Center Leg


Upset about a proposed temporary closure of I-395?

Know that the I-395 Capitol Crossing Air Rights Project" permanently blocks off 50% of the I-395 8 lane sunken right of way.  This includes pinching the median shoulders, impacting safety and the feasibility of the yet to be built freeway connections at its northern end; and the further impacts upon livability and future development potential along the New York Avenue corridor.

UN-reported in the newspapers and developer cheerleader media

http://wwwtripwithinthebeltway.blogspot.com/2014/12/fhwa-bogus-finding-of-no-significant.html
http://wwwtripwithinthebeltway.blogspot.com/2015/02/i-395-center-leg-capitol-crossing-non.html
http://wwwtripwithinthebeltway.blogspot.com/2014/12/open-letter-to-del-eleanor-holmes.html
http://wwwtripwithinthebeltway.blogspot.com/2014/12/current-i-395-center-leg-air-rights-row.html
http://wwwtripwithinthebeltway.blogspot.com/2014/12/unanswered-questions-3rd-street-tunnel.html
http://wwwtripwithinthebeltway.blogspot.com/2014/12/erased-comments-from-wp-article-dc.html


Also see the "Bibleway Church Golden Rule Plaza" apartment building, at 1050 New Jersey Avenue NW, Washington, D.C., built 2002-2003, placed irresponsibly in the path of the un-used northbound I-395 Center Leg Tunnel ramp,
http://wwwtripwithinthebeltway.blogspot.com/2015/11/2002-development-blocks-nb-i-395-center.html
http://www.faqs.org/tax-exempt/DC/Golden-Rule-Apartments-Inc.html
http://wikimapia.org/14628060/Golden-Rule-Plaza

Plus this:
http://wwwtripwithinthebeltway.blogspot.com/2014/12/i-395-pinch-continued.html


Monday, January 05, 2015

Developers' BOGUS Argument For Purple Line Prioritization- that inside the Beltway roads are 'built out'

a better argument would be for developers to pay a greater share of Purple Line costs rather than lying about the inside the Beltway road network
http://www.bethesdamagazine.com/Bethesda-Beat/2014/Group-of-Prominent-Area-Developers-Urge-Hogan-to-Move-Ahead-On-Purple-Line/
“My priority is building roads,” Hogan told the Post. “The priorities are out of whack. Less than 10 percent of the people use mass transit. Most people in the state want the roads fixed.”
In what appeared to be an effort to respond to such arguments, the business coalition closed its letter by telling Hogan, “The existing road network inside Maryland’s Capital Beltway is essentially ‘built out,’ so even if we wished to expand it significantly we would be unable to do so—which means that our innermost suburbs cannot continue to grow or compete with Virginia unless we expand our transit capacity.”
Maryland Governor Hogan

Governor Hogan ought to take the initiative: scrap MD statute 8-601 (b) passed promoted by the late Idamae Garrott in the wake of the 1970s highway de-mapping craze.

 Idamae Garrott b December 24, 1916 - d June 13, 1999
Member of Senate, 1987-94; Economic and Environmental Affairs Committee, Subcommittees on the Environment and Health; Joint Committees on Federal Relations and Federal-State-Local Relations. Senate Member, Coordination Council on Alzheimer's Disease and Related Disorders; Early Childhood Development Council; State Advisory Council for Handicapped Individuals.
Member, House of Delegates, 1979-87.

Montgomery County Council, 1966-74, President, 1971, Chair, Planning Committee, 1970-74; Board Member, Washington Metropolitan Area Transit Authority, 1972-74; Washington Suburban Transit Commission, 1971-74, Chair, 1972; Metropolitan Washington Council of Governments, President, 1974, Chair, Land Use Committee, 1969-74; Chair, Solid Waste Management Agency of Metropolitan Washington, 1969-74. Past President, Montgomery County League of Women Voters and Montgomery County Humane Society, Honorary Member, Wheaton Rescue Squad, Board Member, 1982-84; Honorary Doctor of Laws, Western Maryland College; John Dewey Award, 1982; Humanitarian Award, Montgomery County Education Association, 1985. Maryland NARFE Federation Award, 1988. Author, Paying Our Way, Maryland State Taxes and You.
http://policy.mofcom.gov.cn/english/flaw!fetch.action?id=296c2fec-2e06-478d-bc87-fbfdea0bb112
The statute in question:

§ 8-601. Responsibility for construction and maintenance of State highways.


(a)  Powers and duties in general.- The Administration shall construct, reconstruct, and repair State highways as necessary and shall maintain them in good condition.

(b)  I-95 in Prince George's County; right-of-way for Rockville Facility in Montgomery County.- The Department may not spend any further funds for the construction of I-95 through Prince George's County that will involve a new or reconstructed segment connecting it to any other highway in Prince George's County. The Department may not spend any further funds for the construction of a new highway, arterial, freeway, or expressway in the lands between Viers Mill Road and Northwest Branch described in the 1980 highway needs inventory as the right-of-way reserved for the Rockville Facility in Montgomery County, including the area designated as the Matthew Henson State Park under § 5-1004 of the Natural Resources Article.

(c)  Limitations on prohibition.- This prohibition does not preclude construction in the right-of-way designated as the Rockville Facility of:

(1) Roadway crossings to facilitate traffic flow and highway safety; or 
(2) A hiker/biker trail in the lands between Viers Mill Road and Northwest Branch. 

[An. Code 1957, art. 89B, § 211S; 1977, ch. 13, § 2; 1984, ch. 447; 2003, ch. 294.] 
Since the statute defines the prohibition as upon "I-95", the inside the Beltway extension could be given a different name, particularly if not (yet) connecting to I-395 in the District.  However the 'A Trip Within The Beltway' preference would be a straightforward repeal of the statute.




Maryland needs to begin encouraging Washington, D.C authorities and the Feds to re-map the planned freeways in D.C. - stop pretending that the 1970s 'de-mappings' are sacrosanct, particularly given the specious underlying reasons:
- the world shall run out of fuel by the 1990s somehow rendering the every concept of private automobiles obsolete- Peter S, Craig Committee of 100 letter November 13, 1973

- that the most significant east-west road addition and the one with the least environmental footprint and the greatest potential for encourage brown-field real development, the I-66 K Street Tunnel should be de-mapped because Virginia was not going to build its segment of I-66 inside the Capital Beltway- WRONG- Virginia DID built that I-66 segment.- Peter S. Craig statement November 12, 1975
- that the continuation from the Center Leg to the northeast should not be built because an interstate highway should simply dump out its traffic upon surface New York Avenue making that surface road a de-facto highway

- that the New York Avenue Industrial Freeway highly useful for supporting new brown-field development should be 'de-mapped' for "not [being] even on the interstate system"

- that the SE Freeway should simply end at Pennsylvania Avenue because its extension the East Leg had nothing to connect to- aka the I-395 extension and the I-66 K Street Tunnel both de-mapped for the above stated bogus reasons: a position for a few on Capitol Hill to keep the area a semi-private preserve for a few people to walk their dogs rather than a properly designed interstate highway beneath a box tunnel and surface boulevard with a terracing down to the waterfront- which was missing from the planning of the 1960s and 1970s.
 - that the I-95 and I-70S JFK B&O segments be canceled because Maryland canceled their connecting segments; yet that was done in response to the politicization of the DC segments owing to the crafted controversy of the scuttling of the JFK B&O vision.

Note that the U.S. FHWA page concerning the 1970s de-mapping weirdly shows maps with the earlier 1955 and 1964 planning.

It must be unequivocally stated that the re-mappings are to be based upon a continued design evolution from the later planning- to avoid the waffling done by US FHWA in 1967 to scuttle the freeways by undermining public confidence and support by suggesting that the freeways would be built via the earlier planning that was rightfully opposed and rejected by the general public.

1959 I-66 North Leg Proposal


1971 I-66 North Leg Tunnel Under K Street Proposal


See and compare the plans from 1955 and later:

In particular, planning for the revived Washington, D.C. freeways would depart from the 1971 planning with a re-design of the center section of the North Leg eastward of the area of Mt Vernon Square, the addition of a box tunnel beneath a new waterfront boulevard for the East Leg essentially extending the structure of the Barbey Circle structure, and a further evolution of the JFK low level B&O Route into a new northern Mall- the Grand Arc.  A focus must be made about asking why official planning has been surrendering this opportunity to extend the monumental beauty of Washington D.c. for the sake of developers making a quick buck to keep D.C. locally divided by surface-elevated railroads along with the existing non-tunneled SW Freeway hemmed in by mis-placed development, such as that by EYA, which was allowed to create problems for the Virginia Avenue railroad tunnel reconstruction.

Maryland should get the ball rolling by re-mapping its segments of the I-70S (or I-270E) B&O and I-95 PEPCO-New Hampshire Avenue corridor I-95, and initiate a new design study for these routes, inviting Washington, D.C. and Federal officials to take part.



Maryland should then begin the extension from the I-95 stubs via the PEPCO right of way in a depressed configuration, with 2-3 lanes in each direction expandable to 4 per direction flanking a wide median permitting future flexibility, with retaining walls and overpasses permitting adding decking to create some cut and cover segments- perhaps calling it I-195.

This PEPCO route should be started to at least to an underpass at Adelphi Road- as already considered by official planning as a "Terrapin Connector" for improving access to University of Maryland.   Improve Adelphi Road with a 3rd two lane roadway to shift it away from the houses along its southern side, converting the roadway nearest to these houses for local access, with the new roadway on the opposite side (where there are no houses) to shift Adelphi Road away from these houses.

Better yet, extend this I-195 PEPCO route highway beneath overpasses for University Avenue and Riggs Road, with a temporary ending there, and construct some DuPont Circle underpass scaled 2x2 lane existing right of way cut and cover projects, including at the intersection of Riggs Road and East West Highway to funnel traffic there from Riggs Road to the Prince Georges Shopping Mall area, with perhaps a southbound lane to Ager Rd.

The PEPCO extension could be 6 lanes from the I-95 stubs at the Capital Beltway to Adelphi Road or University Boulevard, and 4 lanes to Riggs Road.

 PEPCO I-95 extension to Riggs Road

1973 PEPCO I-95 study off ramps for Adelphi Road, 
adaptable for such aligned to Riggs Road
Should be aligned as center loader configuration to keep express traffic towards the center of Adelphi and Riggs Road


Design the overpasses atop this depressed grade PEPCO freeway to permit adding deck sections to convert portions to cut and cover tunnel segments over time, such as at University Avenue, allowing new buildings alongside that Avenue atop the new freeway.

Build some other Dupont Circle scaled underpasses-short tunnels - slightly wider to permit right hand shoulders within at various congested intersections of various 4 lane surface arteries - similar to that now being done for the Randolph Road crossing beneath Georgia Avenue, though somewhat longer to improve pedestrian crossings.  Such should be done for some of the intersections of East West Highway, such as crossing beneath Grubb Road and Connecticut Avenue, and further east crossing beneath Baltimore Avenue, for portions of University Avenue, and alongside neighborhoods in closer proximity.

The various underpass projects should include bus stations perhaps in the style of the circular tunnels beneath DuPont Circle- to help explode the myth that freeway design can't be pedestrian-urban friendly.

After all it has been a half century since the region was asked to "urge the deferral of all road expansion plans until a balanced mass transit rail and subway system has been given a fair trial"; and some 40 years since the un-built freeways were de-mapped.

Why are we building a Purple Line yet, when the highway network has been so truncated and neglected?


Sunday, January 04, 2015

About the Least Expensive Type of Underground Freeway




See more:
http://cos-mobile.blogspot.com/2015/01/old-and-new-elevated-and-box-tunnel.html

 Eastern portion of 1996 'Ron Linton' New York Avenue Tunnel-
Why does this not swing to the north side of the Avenue east of the Red Line to excavate a parking strip rather than the more difficult option of continuing further east directly beneath the Avenue?

Saturday, January 03, 2015

The Washington City Paper's Obliviousness To The War On Freeways



excerpt from an April 19 2013 article in The City Paper by Aaron Wiener:
 "There is No War on Cars"
http://www.washingtoncitypaper.com/articles/44173/there-is-no-war-on-cars/
This was the era when slums were condemned and razed in the name of urban renewal, when neighborhoods in Southwest were wiped out to build Brutalist federal office buildings and the quadrant’s eponymous freeway. The push to replace houses with highways amounted to a declaration of war on the District—and particularly the areas around downtown that were home mostly to minorities and the elderly—by “the whole interstate highway lobby, which were basically the oil companies and the aggregate companies and people that built the highways and that sort of thing, car companies, everybody like that,” says Boasberg. Fortunately, residents and preservationists managed to stave off much of the damage by successfully protesting proposed freeways like the Inner Loop encircling the White House in a half-mile radius, the 10-lane North Central Freeway running from Union Station through Brookland to Silver Spring, and the Three Sisters Bridge spanning the Potomac near Georgetown, saving numerous residential areas and parks from destruction.
In the 1980s, with the most aggressive freeway plans shelved and Metro operating with additional construction well underway, the city made modest efforts to restore some high-speed roads to neighborhood-friendly uses. No sheriffs threatened to shoot out anyone’s wheels, but reactions occasionally did get violent. Tom Downs, who led the District Department of Transportation from 1981 to 1983 and now chairs the Metro board, recalls a particularly extreme response to his efforts to remove reversible lanes, which allowed for speedier commutes, from Reno Road NW.

The above is a total blur of the history that ignores the design evolution -- from the clearing of all new swaths demolishing 1000s of dwellings vs the later use of cut and cover tunnels largely with existing corridors -- as well as the politics.

By 1980- ALL the freeway plans were shelved with the one remaining incomplete- the northern tunnel segment of the Center Leg - initially constructed from 1975 to 1978 - left with nothing appropriate to connect to was still un-opened.  And would not be so until a 1983-1986 finishing project to simply have I-395 be entirely intercepted by a surface street, New York Avenue, and be equipped with added walls cutting its 4 lanes in each direction in half.

The plans canceled during the 1970s were vastly different than those from the 1950s and into the 1960s.  Vastly different that the 1955 Inner Loop report that produced the basic design used for the SW and western portion of the SE Freeway.


I-66 North Leg Proposal: 1959


I-66 North Leg Tunnel Under K Street Proposal: 1971


See and compare the plans from 1955 and later:

1955 Inner Loop Engineering Report:
http://wwwtripwithinthebeltway.blogspot.com/2007/01/blog-post.html

1955-1962:
http://wwwtripwithinthebeltway.blogspot.com/2006/12/1950-62-plans.html

Compare the above with the later Inner Loop plans:

1966-1971: North Leg of the Inner Loop
http://wwwtripwithinthebeltway.blogspot.com/2007/03/i-66-north-leg-west-k-street-tunnel.html

1967-1971: East Leg of the Inner Loop
http://wwwtripwithinthebeltway.blogspot.com/2007/03/i-295-east-leg-to-east-capitol-street_17.html

1962-1971 B&O Red Line I-95; see the planning shenanigans that happened with the main northern freeway along the railroad next to Catholic University of America proposed by JFK about one year prior to his assassination:
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html

As refined by 1971, the bulk of the building demolitions were in the middle area of the North Leg, a bit west and to the east of where the Center Leg ands at the intersections of 4th Street, New Jersey and New York Avenues- some 148 and 600+.





The anti freeway protest cry had been "No White man's Roads Through Black Man's Homes."

Yet the bulk of the demonstrations were for 69 reduced by 1970 to 34 dwellings at the western area of Brookland near Catholic University of America; and at the area next to Georgetown University.


 I-95 B&O North Central Freeway next to Catholic University of America






 I-266 3 Sisters Bridge next to Georgetown University

http://wwwtripwithinthebeltway.blogspot.com/2009/10/ectc-paid-to-riot-via-covington-burling.html
See the reasons given for the 1970s 'de-mappings":
http://wwwtripwithinthebeltway.blogspot.com/2009/04/doctrinaire-anti-new-highways-position.html
http://wwwtripwithinthebeltway.blogspot.com/2007/02/doctrinaire-anti-new-highways-position.html


Dear readers of The City Paper: see a concise history of the Washington, D.C. Highway Planning Historic Trends:
http://wwwtripwithinthebeltway.blogspot.com/2014/09/getting-over.html

Also see the excellent site of Scott Kozel: Roads to the Future:
http://www.roadstothefuture.com/DC_Interstate_Fwy.html

Related A Trip Within the Beltway articles:
http://wwwtripwithinthebeltway.blogspot.com/2013/05/washington-dcs-war-on-freeways-war-on.html
http://wwwtripwithinthebeltway.blogspot.com/2013/06/washington-dc-war-on-drivers-war-on.html


Addendum: January 6, 2015:

The City Paper appears to be willfully misleading people with their blurred and overly simplistic reporting of the freeway planning history:


"The City Paper article grossly blurs the history of the freeway planning and the war on the freeways and the less affluent

http://wwwtripwithinthebeltway.blogspot.com/2015/01/the-washington-city-papers.html
http://wwwtripwithinthebeltway.blogspot.com/2014/09/getting-over.html
Read up on the history at A Trip Within the Beltway"

"Your comment has been flagged for spam or trolling and will be reviewed by a moderator. If you feel that this is an error, please leave a comment with your name and email address."
But I did include my name and email address.

Note that I get the same result when re-submitting the comment without the urls:



And at least one of the approved comments has an html tag:


The City Paper is practicing censorship, as I submitted this comment days ago to no avail.

I can only conclude that The City Paper knows that it misrepresents the history- doing so for the sake of medievalists- who in centuries of running Europe opposed free speech.





Thursday, January 01, 2015

Grand Arc

Washington, D.C.'s Future Northern Mall & Underground Railway and I-95-I-270E Multi-Model Parkland Roadway Tunnel Corridor
http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
http://wwwtripwithinthebeltway.blogspot.com/2008/02/grand-arc-mall-headpiece-union-station.html
http://wwwtripwithinthebeltway.blogspot.com/2008/02/monumental-and-mundane.html
Also see the park-river freeway tunnel project in Madrid Spain:
http://cos-mobile.blogspot.com/2011/05/madrid-spain-reclaims-riverfront.html


Building upon what might have been the JFK Vision.
 1962 quote

 "Significance of Using B&O Route. Use of the Baltimore & Ohio Railroad corridor to bring Routes 70-S and 95 into the city is the key to meeting the need for additional highway capacity in northern Washington, Montgomery County and northwestern Prince Georges Counties and at the same time avoiding the substantial relocation of persons, loss of taxable property and disruption of neighborhoods that would result from construction of the Northeast, North Central and Northwest Freeway proposed in the 1959 plan. Further savings are realized by placing the rapid transit line to Silver Spring and Queen’s Chapel in the same railroad corridor."


JFK B&O I-95 1962

Design proposals for Boston Inner Belt- JFK was originally from the Boston area.





The highway was scuttled following the JFK assassination:
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html

Whatever study that was to come out in summer 1963 fulfilling that vision probably was never released.

What was released in 1964: a monstrosity:

1964

A plan more compatible in 1966

1966

But which was subverted by the US FHWA in 1967-68 long enough to generate sufficient public opposition to politically mortally wound it by Dec 1968 with USNCPC reversal

Was last studied in 1971 with plan with some good ideas, yet introducing new objections

Fast forward to the 1990s.

A Trip Within the Beltway creator to be begins exploring un-built DC I-95 having been fascinated by it starting at the age of 9 with a 1972 visit to Washington DC, seeing the truncation, hearing the phrase no white mans homes through black mans homes from a hotel worker at the Howard Johnson in Cheverly, Maryland and wondering 'what about that giant power line right of way alongside and continuing past the I-95 truncation at the Beltway?  Studies the entire PEPCO-B&O route and wonders how such a highway could become so controversial and asks what about a revival upon a design update incorporating lessons learned here and elsewhere.

Studies the Boston Big Dig project, and by 1995 discovers the Grand Arc concept of a vast new green-way extending northward from the rear side of Union Station with underground highway connecting to the existing truncated I-395 Center Leg.

Writes about it in piece published in the July 1997 Takoma Voice.
http://wwwtripwithinthebeltway.blogspot.com/2007/07/volvos-subliminal-message-for-takoma.html

Explains how canceling DC I-95 transferred burden elsewhere and develops the Alexandria Orb as mitigation design for extra wide Capital Beltway in Alexandria Virginia which appeared on the front page of the Alexandra Journal December 18, 2000.
http://wwwtripwithinthebeltway.blogspot.com/2007/02/different-way-alexandria-orb.html
http://wwwtripwithinthebeltway.blogspot.com/2007/02/alexandria-orb-points_117140830358347894.html
http://wwwtripwithinthebeltway.blogspot.com/2007/02/alexandria-orb-page-one-news-december.html

Developed the Highways and Communities website inaugurated in April 2000- now available on Wayback Machine with history of the Washington D.C. freeway system, with the work incorporated into the blog inaugurated in December 2006- "A Trip Within The Beltway".

Devises revised JFK B&O I-95-I-270E plan with nearly fully buried highway carriageways buried beneath new Grand Arc Mall with heavy rail and the WMATA line under-grounded.

Corrects operation-ability issues of 1966+ design with insufficient tunnelization and capacity with new design that employs both sides of the railroad, particularly in Brookland with southbound lanes in new cut and cover tunnel directly alongside CUA beneath --- speaker of the house drive- thus making the spectacular view through the windshield at a portal immediately south of Franklin Street,employing under utilized lightly developed industrial properties between railroad and 9th Street thus increasing capacity while avoiding demolition of homes in Brookland along 10th Street that had been actively protested by anti freeway ECTC protester during the late 1960s.

Adopts a never officially considered alternative routing for the connection to the built Center Leg via a double level tunnel beneath O Street that would arc beneath the recreation field of Dunbar High School and the intersection of New Jersey Avenue and N Streets NW, reducing dwelling displacement from the 600+ of the 1971 plan for a cut and cover tunnel alongside the north side of New York Avenue to as few as 33, while providing superior geometry.

Extends the Washington, D.C. monumental core northwards from Union Station as the Grand Arc Mall headpiece, extending Union Station's walls as this new linear park's frame decorated in the style of the walls near the Capitol building, enclosing the freeway and railways- the latter with space for additional tracks, bringing the New York Avenue crossing to grade and overpassing Rhode Island Avenue before the rail-tracks adopt a gentler grade northwards to pass lower to descend into a bored tunnel past 16th Street in Silver Spring, to allow the Grand Arc Mall to pass at grade through the Brookland and Takoma area, with the WMATA rail climbing to employ the existing historic railroad overpass of Georgia Avenue.

Would extend the service roads flanking Union Station northward framing new linear park.

Would re-surface the Tiber Creek that had been covered over by the railroad and industrial development.

It would completely underground the I-395 or rather I-95 extension to a point north of Taylor street and again going underground to a split beneath a traffic circle at New Hampshire Avenue.  From there, I-395 or I-95 would tunneling along that Avenue's north side taking advantage of he open field of the Eastern Star Masonic home (where 110 houses where only recently erected in contempt), displacing some 27 pre-existing houses within the 1,600 foot long segment between the B&O - Grand Arc corridor and the District-Maryland line.  There the highway would emerge from beneath a new gateway traffic circle at New Hampshire and Eastern, and continuing as a combination of open trench and coverway for another 1,600 feet before swinging beneath and to the south of a new bridge carrying New Hampshire Avenue where the topography drops to swing onto the PEPCO corridor northward to the I-95 stubs at the Capitol Beltway.  

The I-270E extension meanwhile would continue via the B&O-Grand Arc corridor with a brief open trench before again entering a tunnel beneath the new linear park corridor passing beneath a Takoma Station Town Square, and into Maryland, where the WMATA red Line would emerge to rise up and employ the existing 16th Street overpass, with the heavy rail underground until just west of 16th Street., where the freeway would have a cut and cover spur northwards beneath 16th Street and Georgia Avenue, transitioning perhaps to a drilled extension, while the mainline would continue as part coverway - part trench to meet the Capital Beltway to and from the west.

Extra capacity upon that segment of the Capitol Beltway to the existing eastern I-270 spur could be provided by a widening that purchases the houses immediately alongside its south side for a new park covered cut and cover tunnel constructed before relocating the exiting Capital Beltway lanes likewise into a new cut and cover tunnel that would improve the geometrics while expanding Rock Creek Park.

Would be built with 4 separate carriageways underground south of New Hampshire Avenue, with the southbound lanes doublestacked in the cut and cover tunnel alongside CUA, and connect with both the Center Leg and the East Leg- the latter built as a box tunnel with new boulevard atop.
http://wwwtripwithinthebeltway.blogspot.com/2014/09/a-se-freeway-plan-benifiting-greatest.html



http://wwwtripwithinthebeltway.blogspot.com/2008/02/extending-legacy-with-grand-arc.html
http://wwwtripwithinthebeltway.blogspot.com/2012/01/grand-arc-95-270.html