Showing posts with label Inner Loop. Show all posts
Showing posts with label Inner Loop. Show all posts

Tuesday, January 13, 2015

Feds Stoked Controversy Over D.C. Freeways By Keeping EARLIER Routes as Official?


U.S. Federal Highway Authority (FHWA) has a web page about the 'de-mapings' of the various freeway systems, including that near and within Washington, D.C.
http://www.fhwa.dot.gov/highwayhistory/data/page05.cfm

Weirdly, that page , shows the earlier routings for the northern portion of the Inner Loop and the 1964 routing for the North Central Freeway (with the 1967 routings for the South Leg and the East Leg).


It completely disregards the extensive evolution of the highly controversial I-66 North Leg routing via the open trench and raised berm along Florida Avenue and U Street being replaced by the I-66 North Leg K Street Tunnel.

The I-66 K Street Tunnel alternative had the later 1960s support of both the D.C. City Council and U.S. NCPC, with the District Department of Public Works being the sole hold out favoring the U Street plan until late 1969 or early 1970.

The highly unpopular Open Trench and Raised Embankment Along Florida Avenue and U Street

 The plan initiated by opponents to the Florida Avenue-U Street Plan:
the I-66 K Street tunnel
 
http://www.roadstothefuture.com/DC_Interstate_Fwy.html

The I-66 portion of the North Leg of the Inner Loop would have extended from the present I-66 terminus near the Watergate Apartments at K Street NW, extending as the North Leg under K Street NW in a tunnel, and emerging east of Mount Vernon Square and junctioning with I-95 about a mile north of the U.S. Capitol Building. The I-66 portion of the North Leg would have had 6 lanes. The I-66 K Street Tunnel was the solution to the original I-66 alignment that would have run east-west through urban neighborhoods alongside Florida Avenue NW, and between T and U Streets NW about a half mile north of K Street NW. If the K Street Tunnel had been built, it would have been a cut and cover design, about 1.5 miles long, buried out of sight under the straight 147-foot wide avenue, and passing under Mount Vernon Square, and it would have run from near Watergate almost to today's New York Ave./I-395 junction. I-66 crosses the Potomac River from Arlington, Va. to D.C. on the Theodore Roosevelt Bridge, which opened on June 23, 1964.

Likewise the FHWA page on the 'de-mapings' shows the extremely unpopular 1964'Recommended route" #11 'Railroad-Sligo East' version of the B&O Route- which was widely, strongly and legitimately opposed.


  This map of the freeways 'de-maped' during the 1970s
shows the 1964 version of the North Central Freeway
that deviates from the B&O railroad


 1964 version of North Central Freeway 
deviates from B&O railroad just north of New Hampshire Avenue



 1966 version of the North Central Freeways
stays with the B&O railroad- here shown at New Hampshire Avenue


The opposition to the 1964 North Central Freeway plan was so strong that the authorities had to return 2 years later with the 'supplementary' North Central Freeway study report of November 1966 for a low level B&O route more or less conforming to the 1962 JFK vision.  That report included an illustration of a possible decking over of the freeway alongside the main body of Catholic University of America as well as a bit to the south- though fails to include any isometric drawings in detail as done in 1963 and 1965 with the Fenway segment of the proposed Boston Inner Loop.

Proposed park atop Boston Inner Belt- 1965

Proposed lid atop North Central Freeway CUA area- 1966

As can be gathered from a 1967 letter to Maryland Governor Spiro Agnew by Takoma Park resident Duncan Wall, replacing the 1964 plan with the 1966 plan had caused the opposition to largely die down, only to be renewed again with the waffling of authorities, particularly within the then brand new US FHWA to re-consider using the 1964 plan as 'cheaper':

http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
Citizens of Takoma Park and Silver Spring had reason for their demonstrations of bitter dissatisfaction with the highway authorities of your predecessor's administration. After we had been given reason to believe that the causes of our protests had been in at least some part overcome, the matter now threatens to break into renewed bitterness. I am sure you will wish to avoid this as much as many of us....

The re-studied proposal also tacitly admitted that the route first proposed was needlessly, even carelessly if not ruthlessly, destructive of our communities. The new version hugged both sides of the existing Baltimore and Ohio railway, thus avoiding a new swath of destruction to divide our communities and sharply reducing the number of homes to be taken.

The reduced, re-routed proposal was made public last year with endorsement of D.C. And Maryland highway authorities. The D.C. Portion was forced through the National Capital Planning Commission by votes of representatives of the D.C. Highway Department and of the U.S. Bureau of Public Roads. From this we concluded, reasonably enough, that the highway authorities of the two jurisdictions (Maryland and D.C.) had reached a firm understanding with the Bureau of Public Roads.

Many of us were therefore astonished and aroused to preparations for renewed protests when Washington newspapers recently reported that the Bureau has acted to open it all up again. We have not found the Bureau forthcoming with candid information, but the press articles intimate an intention to force Maryland to accept modifications of route or design ostensibly "cheaper."

The result is that the whole controversy, which had been somewhat quiescent, is beginning to agitate the communities again. I can assure you this is so, for although I recently resigned chairmanship of the Metropolitan Citizens Council for Rapid Transit and write this simply as an individual citizen who wishes your administration well, I do remain in close touch with neighborhood sentiment on transportation-related issues.
As reported by The Washington Post, May 8, 1967:
Top officials of the Bureau have ordered a full review of the plans for the 3 ½ mile road … While it is good practice to disrupt as few people as possible in road building, is it worth the added cost of $22 million?

… Rejection by the Bureau would certainly fan the embers of one of the Washington area’s freeway controversies spearheaded by a group called the Save Takoma Park Committee. It rallied the residents of the middle income suburb composed largely of turn of the century homes on tree lined streets to strident opposition at hearings in Washington and Silver Spring on the original [1964] alignment.
http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
A cost savings of $22 million would translate percentage wise to 12.3%, given the approximately $271 million cost given in the 1966 'Supplementary' North Central Freeway Engineering Report for the B&O Low Level Option.

Such was why the D.C. City Council and U.S. NCPC would reverse their long standing support for the JFK B&O freeway concept by the end of 1968:


February 6, 1967: presentation of the new B&O Low Level North Central Freeway plan to NCPC
May 1967: NCPC approves 1st link of North Central Freeway
October 1967: NCPC approves final link of North Central Freeway 8-2
February 1968: law suit decision by U.S. Court of Appeals
February 17, 1970: D.C. City Council votes against North Central Freeway
September 17, 1970: legislation in Congress in the House Public Works Committee ordering North Central Freeway construction.
April 9, 1972: Maryland drops I-70S
February 1973: Maryland drops I-95 by the Northwest Branch Park corridor.
July 16, 1973: Maryland drops I-95 via the PEPCO right of way.
 
Also see:

The following maps show the DC freeway system as the design had evolved by the 1970s:










The federal action of retaining the earlier unpopular routings is consistent with the crafted controversy of the scuttling of the B&O route via the 1964 betrayal of the recently assassinated JFK's planning, the FHWA cir 1967-1968 waffling, along with such things as the highly questionable "support" of such organizations as the Federal City Council.


Should not the FHWA de-maping page instead show maps as these found on Scott M. Kozel's informative site Roads to the Future - and that below of what Maryland canceled in July 1973?

PEPCO-B&O I-95

I was once told by an elderly lady involved with the anti-freeway protests of the 1960s and 1970s that despite the design and routing evolution of that time that had lead to the development of plans that were far far less controversial, that the Feds in fact had formally retained the infinity more controversial earlier plans, thus crafting the levels of anti urban freeway sentiment sufficient to bring about the 'de-mapings.'

I had found that too incredible to believe particularly with the design evolutions that had occurred.  However, the FHWA 'de-maping' page shows maps backing that up.

View the page for yourself:

http://www.fhwa.dot.gov/highwayhistory/data/page05.cfm

Withdrawal of I-70S, 95, 66, 266, 295, 395 &695 -- Washington, DC

Description of Withdrawn Routes
The withdrawal of seven Interstate Routes or portions thereof (I-70S, I-95, I-66, I-266, I-295, I-395 & I-695) in Washington, DC was accomplished in six stages.
Withdrawal Action
Stage One

On June 27, 1975, Mayor Walter E. Washington requested the withdrawal of two segments from the Interstate System: (a) I-95 between I-295 and the Maryland State line and (b) all of I-70S in the district.

On October 3, 1975, Federal Highway Administrator Norbert T. Tiemann and Urban Mass Transportation Administrator Robert E. Patricelli approved the withdrawal of the two routes under the provisions of 23 U.S.C. 103(e)(4). The withdrawal removed 5.4 miles in DC from the Interstate System.

In accordance with Section 103(e)(4), DC's unobligated balance of Interstate Construction (IC) funds was increased by approximately $159.2 million to $304.3 million since the withdrawal was approved prior to the May 5, 1976, enactment of the Federal-Aid Highway Act of 1976. The increase was accomplished by increasing DC's IC apportionment for FY 1977.

Stage Two

On December 29, 1976, Mayor Walter E. Washington requested the withdrawal of two more segments from the Interstate System: (a) the portion of I-66 between I-266 and I-395, and (b) the I-266 Three Sisters Bridge over the Potomac River to the Virginia State line. The two route portions total 2.50 miles.

On April 29, 1977, Federal Highway Administrator William M. Cox and Urban Mass Transportation Acting Administrator Charles F. Bingman approved the withdrawal of the two routes under the provisions of 23 U.S.C. 103(e)(4).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $103.5 million accomplished by decreasing DC's IC apportionment for FY 1977.

Stage Three

On August 7, 1978, Mayor Walter E. Washington requested the withdrawal of portions of the East leg and North Leg Freeways (I-295 and I-395).

On September 8, 1978, Federal Highway Administrator Karl S. Bowers and Urban Mass Transportation Administrator Richard S. Page approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4). The two route portions total 4.70 miles.

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $130.1 million accomplished by decreasing DC's IC apportionment for FY 1977.

Stage Four

On April 30, 1980, Mayor Marion S. Barry requested the withdrawal of a 1.7-mile segment of the South Leg Freeway portion of I-695 between I-66 and I-395.

On August 27, 1980, Federal Highway Administrator John S. Hassell and Urban Mass Transportation Deputy Administrator Lillian C. Liburdi approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4). In addition a 0.12 mile segment of I-695 was deleted from the Interstate System under Section 103(f).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $45.9 million accomplished by decreasing DC's IC apportionment for FY 1980.

Stage Five

On January 27, 1982, Mayor Marion S. Barry requested the withdrawal of the westerly 0.6-mile segment of I-266 between the Three Sisters terminus and Key Bridge.

On June 28, 1982, Federal Highway Administrator R. A. Barnhart and Urban Mass Transportation Administrator Arthur E. Teele approved the withdrawal under the provisions of 23 U.S.C. 103(e)(4).
In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $10.8 million accomplished by decreasing DC's IC apportionment for FY 1982 and 1983.

Stage Six

On May 19, 1983, Mayor Marion S. Barry requested the withdrawal of (a) the remaining 0.51-mile segment of I-266 and (b) a 0.25-mile segment of I-66 within the I-66/I-266 interchange area.

On August 19, 1983, Federal Highway Administrator R. A. Barnhart and Urban Mass Transportation Acting Administrator G. Kent Woodman approved the withdrawals under the provisions of 23 U.S.C. 103(e)(4).

In accordance with Section 103(e)(4), DC's unobligated balance of IC funds was decreased by approximately $12.9 million accomplished by decreasing DC's IC apportionment for FY 1983.
Withdrawal Value
The "Base" withdrawal value was based on the Federal share of the cost to complete these Interstate routes as reported in the Interstate Cost Estimate (ICE) at the time of the withdrawal. The Base cost was adjusted quarterly to determine a new withdrawal value in accordance with Section 125 of the Federal-Aid Highway Amendments of 1974 reflecting variations in the cost of construction. The adjustment due to construction cost variances was terminated by the Surface Transportation Assistance Act of 1982. These values are shown in the following table:

Withdrawal Value & Obligations -- Washington, DC
Stage One Base Cost (1975 ICE)304.3 million
Stage Two Base Cost (1975 ICE)300.6 million
Stage Three Base Cost (1977 ICE)403.5 million
Stage Four Base Cost (1979 ICE)230.4 million
Stage Five Base Cost (1981 ICE)110.2 million
Stage Six Base Cost (1981 ICE)121.8 million
Obligations for Highway Projects233.4 million
Obligations for Transit Projects1,963.5 million
Remaining Entitlement0.8 million
Final Withdrawal Value2,197.7 million




Map of Washington, DC Stage 1 Interstate Highway withdrawals
Map of Washington, DC Stage 2 Interstate Highway withdrawals
Map of Washington, DC Stage 3 Interstate Highway withdrawals
Map of Washington, DC Stage 4 Interstate Highway withdrawals
Map of Washington, DC Stage 5 Interstate Highway withdrawals
Map of Washington, DC Stage 6 Interstate Highway withdrawals
Map of Washington, DC Stage 7 Interstate Highway withdrawals


See some detailed histories here:

http://wwwtripwithinthebeltway.blogspot.com/2012/01/crafted-controversy-scuttling-of-jfks-b.html
http://wwwtripwithinthebeltway.blogspot.com/2014/09/getting-over.html
And see this as an example of how media entities over simplify the history- willfully.
http://wwwtripwithinthebeltway.blogspot.com/2015/01/the-washington-city-papers.html

Tuesday, September 09, 2014

A SE Freeway Plan Benifiting The Greatest Segment of Society

http://www.kirsten6b.org/wp-content/uploads/2014/08/2014-08-04-ANC-mtg-Concept-Alternatives.pdf

C1 [MODIFIED]



Shown as an underground bus depot, though clearly practical as underground box tunnel freeway
connecting into the existing set of box tunnels beneath Barney Circle

Freeway Cover should be modified to connect the north-south running streets to M Street 
and extend Water Street with appropriate waterfront terracing, 
reconnecting neighborhood to waterfront
NONE of the proposed options would do such 

Relatively Low Cost Underground SE Freeway - build box tunnel atop existing eastern SE Freeway and the adjacent railway with terracing down to the waterfront- low cost due to that the most expensive portion of an underground freeway is creating the new excavation, and this segment would not require any new excavation.   Build new linear park atop, flanked by 2+ lane surface roadways tied into the existing street grid, with some new development to the sides.

Extend to new interchanges at East Capitol Street and Benning Road - would require minimal excavation, being cut into side of hill along the western side of the Anacostia River, with northern portion a trench through parking lots, connecting to the New York Avenue Corridor-with access to the BW Parkway and design flexibility to the northwest.

Build such with surface roadways as "complete streets" tied into the street grid; line portions with new development alongside if not atop in areas.
http://greatergreaterwashington.org/post/24147/breakfast-links-taxi-money/#comment-247419 
They could keep the freeway, extend it along the west bank of the Anacostia to Route 50/BW Parkway with interchanges at East Capitol St and Benning Rd and cover the whole thing with a platform containing a "complete street"-type boulevard lined with retail, entertainment, condos, and apartments that intersects with existing neighborhood streets .

This would make lot of sense considering DC's desire to get the 2024 Olympics. The housing could be built as housing for the teams and converted to market and affordable housing later. And since it would be a once in a lifetime project - located away from the historic core where people are obsessed with "views" - perhaps they could relax the height limits, allowing for some really creative and interesting architecture.

But that would require imagination and spunk. Something the District's "leaders" are severely lacking.
Provides underground freeway at considerably less cost then the much needed undergrounding of the existing Anacostia Freeway to the east of the Anacostia River that now cuts off those less affluent areas from the Anacostia Waterfront.

Provides alternative route- crucial for diverting traffic from the existing Anacostia Freeway, making that latter freeways undergrounding - which requires a new excavation -- more practical.  That would increase the likelihood of those less affluent areas to the east of the Anacostia Freeway to have that freeway undergrounded, hence increasing their access to the Anacostia Waterfront.

Opposition to the freeway to the west of the Anacostia River - whether the established portion or the extension -- would be a classic text book example of a wealthier area getting over on a less affluent area, and society at large.  Such is being pushed by officials as ANC 6B09 Commissioners Brian Flahaven and Kirsten Oldenburg.
http://flahaven6b.com/2014/08/07/residents-consider-improved-design-concepts-for-barney-circle-southeast-boulevard-project/#comment-20858 
In November 2013, the District Department of Transportation shared five design concepts for replacing the end of the Southeast Freeway with a boulevard and constructing a full traffic circle at Barney Circle SE. As I detailed at the time, all five DDOT concepts essentially replaced the freeway with….a freeway completely separated from the neighborhood grid. ANC 6B unanimously opposed DDOT’s concepts and urged the agency to reconsider their plans.


ANC 6B

Note that the freeway extension would run along the outer edge of ANC6B and NOT displace any homes there.  Built properly with the box tunnel cover with waterfront terrace, it would actually increase ANC6B's waterfront access.

A freeway extension is alas not being formally considered, only the long established portion to the west of Barney Circle-Pennsylvania Avenue and east of the 11th Street Bridge is being considered.

Recent planning was pushing to have this SE freeway segment decommissioned and replaced at best with a surface street, though DCDOT has apparently had second thoughts and is now moving for its restoration for re-opening.
http://flahaven6b.com/2014/08/07/residents-consider-improved-design-concepts-for-barney-circle-southeast-boulevard-project/ 
Bowing to political pressure from both DC and Maryland commuters, DDOT is planning to temporarily re-open the freeway between 11th Street and Barney Circle by the end of the year. Construction crews are already putting the old road back in place using funding from the 11th Street Bridge Project.
http://flahaven6b.com/2014/08/19/urge-mayor-gray-to-halt-reopening-of-southeast-freeway/#comment-19951
I watched while hundreds of dump truck loads of dirt were piled on the freeway over the last couple years. Now I’m watching as hundreds of dump truck loads of dirt are removed.
Some reasons given:
http://jdland.com/dc/index.cfm/4022/Southeast-Blvd.-New-Concepts-But-Also-an-Unexpected-Reopen/#comment10553 
Let DC reopen this road. It would relieved the operational problems on the other side of the river. Traffic bound for eastbound Pa. Ave enters DC 295 from the left side of the freeway trying to exit to Pa. Ave on the right side of the road. This is dangerous.

On the other hand, westbound Pa. Ave traffic entering DC 295 enters on a cloverleaf ramp trying to merge with DC 295 traffic exiting to Pa. Ave eastbound. Equally dangerous.

This is why I assume the SE freeway spur is being opened.

As for thinking that opening the road will increase traffic on 19th and 17th Streets, drivers were using the narrow ramp by the cemetery illegally. If it was blockaded, the traffic on those two streets would not increase.

Let DC reopen the road to relived the dangerous situation on the other side of the river before some gets injured or killed.
People from the Hillcrest neighborhood, on the eastern, less affluent side of the Anacostia, understandably see this as a positive development.   In response to a letter from Boyle Stuckey, 2d Vice President of the Hillcrest Community Civic Association (HCCA):
We at the District Department of Transportation (DDOT) have received your support for reopening the connection between the Southeast/Southwest Freeway (I-695) between 11th Street SE and Barney Circle.

This is an important connection for District residents east of the Anacostia River, primarily in Ward 7. Reopening this roadway segment will reestablish traffic movements (for example, eastbound I-695 to eastbound Pennsylvania Avenue SE toward Ward 7; westbound Pennsylvania Avenue SE to westbound I-695).

We appreciate your support and will take your concerns about closing the left-turn lane from Pennsylvania Avenue SE to northbound DC 295 into consideration. For further questions, please contact DDOT at 202-673-6813.
DCDOT is doing the right thing- as a foundation and start for a significant change for the better.

Links:

http://www.anacostiawaterfront.org/project-updates/meeting-materials-barney-circle-southeast-boulevard-112113-public-meeting/

http://jdland.com/dc/index.cfm/4022/Southeast-Blvd.-New-Concepts-But-Also-an-Unexpected-Reopen/#comment10553

http://flahaven6b.com/2014/08/07/residents-consider-improved-design-concepts-for-barney-circle-southeast-boulevard-project/

http://www.kirsten6b.org/wp-content/uploads/2014/01/01-14-DDOT-2nd-Public-Mtg-of-Barney-Circle-SE-Blvd-Transportation-Planning-Study.pdf

---

In the day and a half since I published this piece, not one but two articles have appeared on this freeway segment in David Alpert's Greater, Greater Washington:

http://greatergreaterwashington.org/post/24152/a-traffic-engineer-and-a-planner-both-study-a-closed-freeway-segment-their-conclusions-are-wildly-/

http://greatergreaterwashington.org/post/24154/when-temporary-becomes-permanent-why-reopening-the-se-freeway-is-risky/


Very interesting comments section in both.  Likewise with the following 2010 and 2013 GGW articles on the adjacent area to the south:

http://greatergreaterwashington.org/post/5732/ncpc-worries-about-viewsheds-in-waterfront-development/

http://greatergreaterwashington.org/post/17788/do-we-need-a-southeast-boulevard-at-all/
Last spring, I was in a studio at school that looked at the development potential of removing or capping parts of the Southeast/Southwest Freeway. I did the urban design plan, and in the area you're talking about, we extended the existing street grid to the river and got a pretty substantial amount of housing and a lovely waterfront park to boot.

My beef with Southeast Boulevard is that they didn't really consider how the street would fit into a larger scheme for that area. It could be the spine of a new waterfront neighborhood, but instead it'll just be a street as divorced from its context as the freeway is.
by dan reed! on Feb 28, 2013 11:12 am • link •
Dan Reed- I would love to see that studio's work.

A Landmark Example of 'Hill East' Gated Community Mentality
http://wwwtripwithinthebeltway.blogspot.com/2013/08/washington-dc-war-on-people-shuns-east.html